RA-24-0247, AP1000 Combined License Application Departure Report Update and Annual Final Safety Analysis Report (FSAR) Update
| ML25296A026 | |
| Person / Time | |
|---|---|
| Site: | 05200022, 05200023 |
| Issue date: | 10/23/2025 |
| From: | Nolan M Progress Energy Carolinas |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| RA-24-0247 | |
| Download: ML25296A026 (1) | |
Text
M. Christopher Nolan Vice President New Nuclear Generation Strategy& Regulatory Engagement 13225 Hagers Ferry Rd., MG011E Huntersville, NC 28078 (704) 382-7426 Chris.Nolan@duke-energy.com 10 CFR 52, Appendix D, X.B Serial: RA-24-0247 October 23, 2025 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNITS 2 AND 3 DOCKET NOS.52-022 AND 52-023
SUBJECT:
AP1000 Combined License Application Departure Report Update and Annual Final Safety Analysis Report (FSAR) Update
REFERENCE:
- 1. Letter from J. Scarola (Duke Energy) to U.S. Nuclear Regulatory Commission (NRC),
dated February 18, 2008, Application for Combined License for Shearon Harris Nuclear Power Plant Units 2 and 3, (ADAMS Accession No. ML080580078).
- 2. Letter from Chris Nolan (Duke Energy) to NRC, dated April 3, 2025, AP1000 Combined License Application (COLA) Departure Report Update and 10 CFR 50.46 Annual Update, (ADAMS Accession No. ML25093A287).
- 3. Letter from Christopher M. Fallon to U.S. Nuclear Regulatory Commission (NRC),
dated April 15, 2013, Shearon Harris Nuclear Power Plant Units 2 and 3 Submittal of COL Application, Revision 5, (ADAMS Accession No. ML13112A766).
Duke Energy Progress, Inc. (DEP) submitted an application, dated February 18, 2008, for a combined license (COL) for two AP1000 advanced pressurized water reactors to be located at the Shearon Harris Nuclear Power Plant Site (Reference 1). Part 7 of the application is entitled Departures and Exemption Requests. This letter provides an update to the report describing plant-specific departures from the AP1000 Design Control Document (i.e., Departures Report) as required by 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b. The following reports are addressed by this letter:
Semi-Annual Departures Report Annual FSAR Update Semi-Annual Departures Report. For the Shearon Harris Nuclear Power Plant, Units 2 and 3, during the period of April 3, 2025, to October 23, 2025 (Reference 2).
There have been no new departures or changes to the departures described in the COLA Part 7, Departures and Exemption Requests Annual FSAR Update. 10 CFR 50.71(e)(3)(iii) requires that the FSAR be updated annually until the Commission makes the finding under 10 CFR 52.103(g). No FSAR information has been revised, deleted, or added since the submittal in Reference 3.
1.. DUKE
- ~ ENERGY
U.S. Nuclear Regulatory Commission RA-24-0247 Page 2 This submittal contains no new regulatory commitments.
Please address any comments or questions regarding this matter to Lee Grzeck, Licensing Manager-New Nuclear Generation at (980) 373-1530.
Sincerely, M. Christopher Nolan Vice-President, New Nuclear Generation Strategy and Regulatory Engagement
U.S. Nuclear Regulatory Commission RA-24-0247 Page 2 cc:
J. Lara, U.S. NRC Region II Administrator, Acting J. Glisan, U.S. NRC Project Manager