ML22259A145
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Request | |
|---|---|
EPID:L-2021-TOP-0022, Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) (Approved, Closed) | |
MONTHYEARML23011A1052011-01-11011 January 2011
[Table View]Redacted Draft Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Draft Approval ML21215A5092021-08-31031 August 2021 NRC Form 898, Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, Revision 1 Project stage: Other PMNS20220090, Technical Discussion of Kairos Power Responses to the NRC Staffs Preliminary Questions on the Graphite Materials Qualification Topical Report, Revision 12022-02-0404 February 2022 Technical Discussion of Kairos Power Responses to the NRC Staffs Preliminary Questions on the Graphite Materials Qualification Topical Report, Revision 1 Project stage: Request PMNS20220667, Kairos Power Graphite Materials Qualification Topical Report, Rev. 2: Follow-Up Clarification Meeting2022-06-16016 June 2022 Kairos Power Graphite Materials Qualification Topical Report, Rev. 2: Follow-Up Clarification Meeting Project stage: Request ML22259A1452022-09-30030 September 2022 KP-TR-014-NP, Revision 4, Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor Project stage: Request ML23038A1682023-02-13013 February 2023 Draft Safety Evaluation of the Kairos Topical Report - KP-TR-014, Revision 4 - Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor Project stage: Request ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR Project stage: Approval ML23062A7272023-03-13013 March 2023 Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Request ML23062A7322023-03-13013 March 2023, 14 March 2023 Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Request ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR Project stage: Approval ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval 2022-06-16 |
| ML22259A145 | |
| Person / Time | |
|---|---|
| Site: | 99902069 |
| Issue date: | 09/30/2022 |
| From: | Kairos Power |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22259A142 | List: |
| References | |
| KP-NRC-2209-013 KP-TR-014-NP, Rev 4 | |
| Download: ML22259A145 (106) | |
Similar Documents at 99902069 | |
|---|---|
Retrieved from "https://kanterella.com/w/index.php?title=ML22259A145&oldid=5529596"