ML25239B555

From kanterella
Revision as of 22:54, 9 September 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

EPRI Statement That There Are No Prop Information in RI-HELB SE for Prop Review for EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements
ML25239B555
Person / Time
Site: Electric Power Research Institute
Issue date: 08/26/2025
From: Fougerousse R
Electric Power Research Institute
To: Lois James
Licensing Processes Branch
References
EPRI TR 3002028939, EPID L-2024-LRM-0062 pre-app, EPID L-2024-TOP-0003 pre-fee, EPID L-2024-NTR-0006 post-fee, Risk-Informed HELB Methodology
Download: ML25239B555 (1)