E-mail - NRC Completion Determination Form 898 for EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements
ML24214A027
Person / Time
Site: Electric Power Research Institute
Issue date: 09/10/2024
From: Lois James
Licensing Processes Branch
To: Ruszkowski M
Electric Power Research Institute
References
EPRI TR 3002028939, EPID L-2024-LRM-0062 pre-app, EPID L-2024-TOP-0003 pre-fee
Download: ML24214A027 (1)


Text

1 Lois James From:

Lois James Sent:

Tuesday, September 10, 2024 2:34 PM To:

Ruszkowski, Michael J.

Cc:

RidsNrrOd Resource; RidsNrrDex Resource; RidsNrrDexEMIB Resource; RidsNrrDexESEB Resource; RidsNrrDnrl Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsNrrDra Resource; RidsNrrDraApla Resource; Demetrius Murray; Gerond George; Lois James; James Delosreyes; Stewart Bailey; Bob Pascarelli; Kamal Manoly; Chakrapani Basavaraju; John Bozga; Kaihwa Hsu; David Rudland; David Gennardo; Ching Ng; Ian Tseng; Robert Tregoning; Jeff Poehler

Subject:

U. S. Nuclear Regulatory Commission Completion Determination Form 898 for EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements (L-2024-TOP-0003) - CORRECT FORM Attachments:

RI-HELB - NRC 898 - signed.pdf Michael Ruszkowski, Plant Support Director Electric Power Research Institute 1300 West W.T. Harris Blvd Charlotte, NC 28262-8550 Michael Ruszkowski:

Attached is the U.S. Nuclear Regulatory Commission (NRC) staff completeness determination for the EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements. The NRC staff determined that it provides sufficient information for the NRC staff to conduct a detailed technical review.

As discussed, the NRC staff plans to issue its draft safety evaluation by August 8, 2025. If needed, the NRC staff will issue a request for additional information (RAI) by January 8, 2025, with a request for UIUC to provide a response within 30 days. The NRC staff estimates that 1200 staff hours will be needed to complete the technical review and issue the safety evaluation. The schedule and level of effort could change due to several factors including, the need for additional RAIs, unanticipated changes to the scope of the review, and unsolicited supplements to the topical report. The NRC staff will communicate any changes to the review schedule or estimated staff hours by email, including the reason(s) for the changes.

If you have any questions, please feel free to contact me via email lois.james@nrc.gov.

Sincerely, Lois M. James, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Docket No. 99902021 EPID: L-2024-TOP-0003 ADAMS Accession Nos.: ML24214A023 (pkg); ML24214A027 (email); ML24214A034 (Form 898)

  • via email NRR-106 OFFICE NRR/DORL/LLPB/PM NRR/DEX/EMIB/BC NRR/DRA/APLA/BC NRR/DORL/LLPB/BC NAME LJames*

SBailey*

BPascarelli JCircle for*

GGeorge*

2 DATE 08/22/2024 09/09/2024 08/22/2024 09/09/2024 OFFICE NRR/DORL/LLPB/PM NAME LJames*