1
.
N 21082
Docket No. 50-373
Commonwealth Edison Company
NITN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
Thank you for your letter dated July 7,
1982, informing us of the steps
you have taken to correct the noncompliance which we brought to your
attention in Inspection Report No. 50-373/82-25 forwarded by our letter
dated June 9,
1982. We will examine these matters during a subsequent
inspection.
Your cooperation with us is appreciated.
Sincerely,
45eo
lL).) $$
W. S. Little, Chief
Engineering Inspection Branch
cc: Louis 0. DelGeorge, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson
,
Project Manager
!
!
cc w/ltr dtd 7/7/82:
l
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
.-
)!
8207260062 820721
PDR ADOCK 05000373
G
,
!
RIII
RITI
RIII
RIII
RIII
RII
n'hv
Qb9
Rb1 {<,t
IW2 k.
9pfI/l
'
f
Lanksbury/sv
Maura
Robidson
Jachiw
Walker'
it le
7pf/pp
7/13/82
(