ML020310536
| ML020310536 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/09/2002 |
| From: | Combustion Engineering |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| E-232-408-5 | |
| Download: ML020310536 (1) | |
Text
LR-RV LR-RC LR-RV LR-RC LR-RV LR-RV*
LR-RV LR-RV**
Flow skirt is covered in the Reactor Vessel Internal (RVI) EA.
LR-RV*
LR-RV
- - ICI housings are within the scope of License Renewal Boundary in the RV System.
- - CEDM housings are within the scope of License Renewal Boundary in the RV System.
- - Boundary is at valve RC-100.
LR-RV LR-RC***
FOR INFORMATION ONLY NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.
IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.
- PORTIONS OF SYSTEM WITHIN LICENSE RENEWAL SCOPE ARE BOUNDED BY LR FLAGS.
- UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
- ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
- IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
- THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.