NRC Comments on Draft Operating Test
ML041060078
Person / Time
Site: Ginna 
Issue date: 04/02/2004
From: Conte R
NRC/RGN-I/DRS/OSB
To: Maciuska F
Rochester Gas & Electric Corp
Conte R
References
50-244/04-301
Download: ML041060078 (4)


Text

CHANGES TO THE OPERATING EXAM SINCE THE INITIAL SUBMITTAL Control Room/In-Plant Systems u

JR012.008 Borate RCS for SDM Change :

Made Step 4 (Reset SI) Critical Reason:

Resetting SI necessary to complete the actions JR005.009 Establish S/G Cooling per AP-RHR. 1 Change:

Reason:

Steps 5 (Start RHR), 9 (RCS Closed), and 10 (Monitor RCS Temp) made critical Each is a required transition in the procedure JROlO.003 Depressurize RCS using N2 Change:

Reason:

Deselected Alternate Path on this JPM Test item did not provide sufficient discrimination when used as an alternate path i/

JR029.001 Startup the CNMT Mini Purge Change:

Reason:

Made step 3 not critical The step verifies an expected condition; no operator action needed JC063.001 Align TSC Battery to Main Fuse Cabinet 1B Change:

Steps 3 and 5 not critical Reason:

The steps verify normal conditions, no operator action needed JC 103.007 Attachment CI/CVI Change:

Reason:

Removed SOV-922 from list of valves to isolate All valves now in RCA; improves efficiency of JPM administration

RO Admin. Exam JROOl.008 Calculate SDM for an Operating Reactor with an Untrippable Rod Change:

Modified P M to allow its use in classroom without needing the plant or simulator b

Reason:

Improves efficiency of JPM administration J R O 1 5.OO 1 Manually Calculate QPTR Change:

Reason:

Modified JPM to allow its use in classroom without needing the plant or simulator Improves efficiency of JPM administration JR352.001 Monitor Critical Safety Function Status Trees Change:

Modified JPM to allow its use in classroom without needing the simulator and change critical step so that only abnormal conditions are critical Reason:

Improves JPM administration efficiency; normal (GREEN path) conditions not critical

SRO Admin. Exam JS343.003 Shift Staff Emergency Call-In Change:

Rewrote JPM to focus on overtime limits and to have explanation of reasons for rejection u

Reason:

Better discrimination JS341.001 Loss of Safety Function Determination Change:

Added more Out of Service Equipment Reason:

As written, the safety hction determination was too straight-forward and non-discriminatory; additional 00s equipment adds realism and requires more analysis

Simulator Scenarios Scenario 04-2 Changes:

1) Added "A" Charging Pump 00s at beginning of scenario
2) Moved Hotwell Level Failure to later in the scenario

./'

Reasons:

1) Given more actions for the operator to perform when offsite circuit is lost
2) If the operator fails to take action in time, to limit the effect on the scenario of the resulting Rx Trip Scenario 04-3 Changes:
1) Insert PT-429 Failure as an existing condition at the beginning of the scenario
2) Move Charging Pump Speed Failwe earlier in the scenario Reasons:
1) Required to cause an inadvertent SI later in the scenario but by itself does not
2) Slow Transient, moved forward to give more time to see the event add to the evaluation since the SRO is a substitute