ML050320055

From kanterella
Revision as of 22:39, 15 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Examination Approval Ltr. (Folder 1)
ML050320055
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/28/2005
From: Conte R
NRC/RGN-I/DRS/OSB
To: Thayer J
Entergy Nuclear Operations
Conte R
Shared Package
ML042440154 List:
References
Download: ML050320055 (3)


Text

January 28, 2005 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL VERMONT YANKEE NUCLEAR POWER STATION

Dear Mr. Thayer:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Vermont Yankee Nuclear Power Station.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Mike Desilets, Mgr. Training and Development. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, on February 3-4, 2005. The NRC staff will administer the operating tests during the week of January 31 through February 3, 2005.

Please contact your Chief Examiner, John G. Caruso, at 610-337-5389, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-271 License No. DPR-28

Mr. Thayer cc:

M. R. Kansler, President, Entergy Nuclear Operations, Inc.

G. J. Taylor, Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President and Chief Operating Officer D. L. Pace, Vice President, Engineering B. OGrady, Vice President, Operations Support J. M. DeVincentis, Manager, Licensing, Vermont Yankee Nuclear Power Station Operating Experience Coordinator - Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety Assurance M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.

S. Lousteau, Treasury Department, Entergy Services, Inc.

Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.

D. R. Lewis, Esquire, Shaw, Pittman, Potts & Trowbridge G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

D. Katz, Citizens Awareness Network (CAN)

R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant Commonwealth of Massachusetts, SLO Designee State of New Hampshire, SLO Designee State of Vermont, SLO Designee M. Desilets, Manager - Training and Development

Mr. Thayer Distribution:

S. Collins, RA J. Wiggins, DRA C. Anderson, DRP D. Florek, DRP S. Lee, RI OEDO D. Roberts, NRR R. Ennis, PM, NRR V. Nerses, Backup PM, NRR D. Pelton, DRP, Senior Resident Inspector A. Rancourt, DRP, Resident OA J. Caruso, DRS, Chief Examiner DRS Master Exam File, C. Bixler, w/concurrences R. Conte, DRS DOCUMENT NAME:E:\\Filenet\\ML050320055.wpd SISP Review Complete: CJB ADAMS PKG: ML042440154 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler/CJB JGCaruso/JGC RJConte/RJC DATE 01/27/05 01/27/05 01/28/05

-+

OFFICIAL RECORD COPY