CY-05-158, Attachment 2 - Haddam Neck Plant Observations, Sampling and Analysis of Clayey Secondary Mineral Deposits Observed in Bedrock Fractures in the Primary Auxiliary Building Dated June 16, 2005

From kanterella
Revision as of 17:24, 15 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Attachment 2 - Haddam Neck Plant Observations, Sampling and Analysis of Clayey Secondary Mineral Deposits Observed in Bedrock Fractures in the Primary Auxiliary Building Dated June 16, 2005
ML052200476
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
(DPR-061)
Issue date: 06/16/2005
From: Chris Miller
Connecticut Yankee Atomic Power Co
To:
NRC/FSME
References
CY-05-158
Download: ML052200476 (214)


Text