CY-05-158, Attachment 2 - Haddam Neck Plant Observations, Sampling and Analysis of Clayey Secondary Mineral Deposits Observed in Bedrock Fractures in the Primary Auxiliary Building Dated June 16, 2005

From kanterella
(Redirected from CY-05-158)
Jump to navigation Jump to search
Attachment 2 - Haddam Neck Plant Observations, Sampling and Analysis of Clayey Secondary Mineral Deposits Observed in Bedrock Fractures in the Primary Auxiliary Building Dated June 16, 2005
ML052200476
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
(DPR-061)
Issue date: 06/16/2005
From: Chris Miller
Connecticut Yankee Atomic Power Co
To:
NRC/FSME
References
CY-05-158
Download: ML052200476 (214)


Text