LR-N06-0398, Partial Withdrawal of License Amendment Request to Relocate Overcurrent Protective Devices
| ML062760297 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/25/2006 |
| From: | Jesse M Public Service Electric & Gas Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LCR H05-04, LR-N06-0398 | |
| Download: ML062760297 (2) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 4 PSEG Nuclear LLC 10 CFR 50.90 LR-N06-0398 LCR H05-04 September 25, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
Partial Withdrawal of License Amendment Request to Relocate Overcurrent Protective Devices
References:
- 1) PSEG letter LR-N05-0030, "Request for Change to Technical Specifications: Relocation of Overcurrent Protective Devices,"
October 11,2005
- 2) NRC letter, "Hope Creek Generating Station - Issuance of Amendment Re: Deletion of Component Identification for Overcurrent Protective Devices (TAC No. MD1090)," April 10, 2006
- 3) NRC letter, "Hope Creek Generating Station - Request for Additional Information Related to Amendment Request to Relocate Overcurrent Protective Devices (TAC NO. MC8602)," August 24, 2006 In Reference 1, PSEG Nuclear LLC (PSEG) requested changes to the Technical Specifications (TS) for Hope Creek Generating Station to relocate TS requirements for overcurrent protective devices to the Updated Final Safety Analysis Report (UFSAR).
Relocation of the TS requirements for primary containment penetration overcurrent protective devices is consistent with NUREG-1433, "Standard Technical Specifications General Electric Plants, BWR/4." In Reference 2, the NRC approved a portion of the proposed change, specifically relocation of the component identifiers from the overcurrent protective device lists in TS 3/4.8.4.1 and TS 3/4.8.4.5. In addition, the NRC stated that it would continue reviewing the proposed relocation of the remainder of TS 3/4.8.4.1 and TS 3/4.8.4.5.
95-2168 REV. 7/99
LR-N06-0398 September 25, 2006 Page 2 Reference 3 stated that additional information is necessary for the NRC staff to complete its review. PSEG has determined that the portion of the proposed change approved in Reference 2 is sufficient to support current operation and maintenance activities and that the remainder of the request from Reference 1 is not required.
Therefore PSEG withdraws the remainder of the proposed change still under NRC review.
If you have any questions or require additional information, please contact Paul Duke at 856-339-1466.
Sincerely, Michael Jesse Regulatory Assurance Manager Hope Creek cc:
S. Collins, Regional Administrator-NRC Region I S. Bailey, Project Manager - Hope Creek, USNRC NRC Senior Resident Inspector - Hope Creek K. Tosch, Manager IV, NJBNE