Condition Report CR-IP2-2008-02938
ML090400305
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/05/2008
From: Anthony Williams
Entergy Nuclear Operations
To:
NRC Region 1
John Richmond
References
05000247/2008003, CR-IP2-2008-02938
Download: ML090400305 (4)


Text

J CONDITION IREPORT CR-IP2-2008-02938 Originator: Williams,Anthony L Originator Phone: 5299 Orlgtaator Croup: Operations Mgmt Supervisor Name: Vinci,Donald W Operability Required: Y Reportability Requlred: N Discovered Date: 06/05/2008 19: 1 1 lnltlated Date: 06/05/2008 19:22 Condition

Description:

During a walkdown of Operations Procedure SOP 27.6, the NRC had qucsitons associated with the procedure guidance. See attached list of comments.

Suggested Action Descrlptlon:

Reviey comments snd evaluate for procedure enhancements.

I CR-IP2-2008-02938 -

Entegy' 1 OPERABILITY OperabflityVerslon:

1 Operability Code: EQUTPMENT FUNCTIONAL lmmediate Report Code: NOT REPORTABLE Performed By: Oamache,Kenneth S 06/06/2008 01 :42 Approved By: Hock,Charles E 06/06/2008 0156 Operabillty Descriptlon:

The CRjefers to a list of items to enhance the pqfp e? of 23QP-.2?.6 Unit 2 Appendix R Diesel Generator Operation.

maintain the Unit 2 SBO/Appendix R diesel functional. Each individual item and the answer to it is listed in the attachment.

The Unit 2 SBO/Appendix R diesel is functional.

The items should be t9aluated and incorporated wher 7r a&hobiidte, bdt none of the items sre required to be implemented to cndix R diesel is functional as validated by the attachment.

Attachments:

Operabiliry Dcscriptiofi Functionality determination

NRC Questlon associafed with SOP 27.6

1. In Attachment 4, Step 1 2 "IF desired to energize Bus 6A or 3A, etc." this step sequence actually appears to align only Bus 3A.

Answer. Operations should review the procedure and make any required changes.

Forfhe SBO/Appendix R diesel to perform it's safety function during a Station Blackout it is required to energize ONE 480 to energize rno an ONE 480 V Bus and functional.

us. The procedure provides guidance he SBO/Appendix R diesel is

!there is no reference to the use of PPE when going nts and no PPE is staged at the breakers for this

e. Also, the emergency battery lights may not provide adequate illumination for manual 'bteaker and transfer switch operations.

Answer: Staging PPE locally should be evaluated by opemtions and the adequacy of emergency lighting should be evaluated by fire protection. PPE is available close by in a dedicated locker on the 15 foot turbine hall. Flashlights are normally carried by ional flashlights are. available near by from a ne hall. Ohtaining PPEor flashlights will only add a nd there is sufficient margin to perform all required instructions in this step. A reference to Step 4,9 may have provided better guidance on the buttons location.

Answer:,Operations should review the procedure and make any required changes..

ble'performing a step. The and so the SBO/Appendix R rginrtolths tirqeiine tol ompletion of all required mperature values are not Answer: Operations should review the procedure and make any required changes.

The procedure has values for setting cooling flows that have been analyzed under worst case conditions to keep the engine properly cooled while performing it's design

'function. Also the,S ing alarms for high jacket water SBOIAppendix R diesel is functional.

rm the operator to values and so the S

I

10. Attachment 4, Step 1.3,18 - The operator performing the procedure gets to this step only if the Bus 2A / 5A alignment is selected. This step is not addressed if the Bus 6A / 3A alignment is selected.

Answer: Answer: Operations should review the procedure and make any required changes. For the SBO/Appendix R diesef to perform it's safety fundion during a Station Blackout it is required to energize ONE 480V Bus. The procedure provides guidance to energize more than ONE 480 V Bus and so the SBO/Appendix R diesel is functional.

11. Attachment 4 in general - The procedure leads the operator to align all four safeguards buses and the operator on the wallcdown indicated that he would actually align all four safeguards bus one safegua5ds, train for; plant sbutdo ven thoughtthe SBO design is to align I

Answer; The CRS will Operators are tt-ained to verify adequate load capability remaining on a diesel prior to starting a load. There is information in the procedure that give the SBOlAppendix R diesels load ratings and directs that when starting equipment, coordination with the CRS will be necessary to ensure adequate generator capacity is available. The emergency procedures contain a list of loads with their associated KW values. There is enough training and procedural guidance to ensure that all required actions will be the SBQ/bppendix+ R diesel is functional, he Operator on which bus is required to be lined up.

ice water is only re'quired for the edure section has a note that states the alteroate sgfe shutdgwn following:i For,an,gppendiX R evegt, the City Water Storage Tank will provide the cooling water for the first few hours of the event. Once a Service Water Pump is running, cooling of the Appendix R DG is transferred to the Service Water System.

There is also a note that states the following: Maintaining the City Water flows specified ensures that adequate volume in the City Water Storage Tank is reserved e for the operator to the city water storage TOTRL 7.13