ML102600142

From kanterella
Revision as of 02:52, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation
ML102600142
Person / Time
Site: Ginna  
Issue date: 10/05/2010
From: Wastler S
NRC/NSIR/DSP/DDMS/MWISB
To: David Pstrak
NRC/NMSS/SFST/LID/RIOB
Wastler, S L, DSP/MWISB 301-415-8733
References
Download: ML102600142 (2)


Text

October 5, 2010 MEMORANDUM TO:

Dave Pstrak, Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM:

Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE R.E. GINNA NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On August 2-6, and 23, 2010, a Security Inspection conducted by Dennis Lawyer, from Region I, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the R.E. Ginna Nuclear Power Plant, has successfully met the objectives outlined in the TI 2690/008 and IP 81001.1 dated October 17, 2007. The Inspection Report number is 05000244/2010404. Based on our review, we have determined that the R.E. Ginna Physical Security Plan, has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-415-6786, Douglas.garner@nrc.gov or Mike DEttore at (301) 415-0422 michael.dettore@nrc.gov CONTACT:

Doug Garner, DSP/NSIR (301) 415-6786 Mike DEttore, DSP/NSIR (301) 415-0422

October 5, 2010 MEMORANDUM TO:

Dave Pstrak, Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM:

Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE R.E. GINNA NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On August 2-6, and 23, 2010, a Security Inspection conducted by Dennis Lawyer, from Region I, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the R.E. Ginna Nuclear Power Plant, has successfully met the objectives outlined in the TI 2690/008 and IP 81001.1 dated October 17, 2007. The Inspection Report number is 05000244/2010404. Based on our review, we have determined that the R.E. Ginna Physical Security Plan, has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-415-6786, Douglas.garner@nrc.gov or Mike DEttore at (301) 415-0422 michael.dettore@nrc.gov CONTACT:

Doug Garner, DSP/NSIR (301) 415-6786 Mike DEttore, DSP/NSIR (301) 415-0422 DISTRIBUTION:

DSP r/f ADAMS ACCESSION NO.: ML102600142 OFFICE DSP/MWISB MWISB/BC NAME D. Garner S. Wastler DATE 10/ 05 /10 10/ 05 /10 OFFICAL RECORD COPY