Report 22 Inspection/Activity Plan
ML112440152
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/01/2011
From:
Division Reactor Projects II
To:
Shared Package
ML112440143 List:
References
IR-11-006
Download: ML112440152 (1)


Text

Inspection / Activity Plan Page 1 of 1 09/01/2011 06:34:20 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick TFPI

- 805 TFPI 5

1, 2 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 10/31/2011 11/04/2011 1, 2 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 11/14/2011 11/18/2011 PSB1-RP

- PUBLIC RADIATION PROTECTION BASELINE 3

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/13/2012 02/17/2012 1, 2 IP Radiological Environmental Monitoring Program 71124.07 02/13/2012 02/17/2012 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/13/2012 02/17/2012 1, 2 IP Performance Indicator Verification 71151 02/13/2012 02/17/2012 PSB1-RP

- RADIOLOGICAL HAZARDS ASSESSMENT 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2012 03/02/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 03/05/2012 03/09/2012 EB3 HS

- TRIENNIAL HEAT SINK INSPECTION 1

1, 2 IP Heat Sink Performance 7111107T 06/25/2012 06/29/2012 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 08/06/2012 08/10/2012 1, 2 IP Performance Indicator Verification 71151 08/06/2012 08/10/2012 OL EXAM

- INITIAL EXAM PREP 4

1 BRUNSWICK / AUGUST 2012 EXAM AT POWER FACILITIES V23376 11/12/2012 11/16/2012 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 11/26/2012 11/30/2012 OL EXAM

- INITIAL EXAM - WEEK 1 4

1 BRUNSWICK / AUGUST 2012 EXAM AT POWER FACILITIES V23376 12/03/2012 12/07/2012 OL EXAM

- INITIAL EXAM - WEEK 2 4

1 BRUNSWICK / AUGUST 2012 EXAM AT POWER FACILITIES V23376 12/10/2012 12/14/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.