NRC-2013-0005, Comment (1) of James Ohara Opposing Florida Power Corporation, Crystal River Unit 3, Draft Environmental Assessment Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level
| ML13044A010 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/31/2013 |
| From: | O'Hara J - No Known Affiliation |
| To: | Rulemaking, Directives, and Editing Branch |
| References | |
| 78FR3458 00001, NRC-2013-0005-0001 | |
| Download: ML13044A010 (1) | |
Text
Page 1 of 1 As of: February 06, 2013 Received: January 31, 2013 PUBLIC SUBMISSION Status: Yenclng_flost PUBLC S
BMISIONTracking No. ljx-83fe-6zf9 Comments Due: February 15, 2013 Submission Type: Web Docket: NRC-2013-0005 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level - Crystal River, Unit 3 Comment On: NRC-2013-0005-0001 Florida Power Corporation, Crystal River Unit 3, Draft Environmental Assessment Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level Document: NRC-2013-0005-DRAFT-0001 Comment on FR Doc # 2013-00781
/'2' /~
c25~(jfY2 Submitter Information 0
7-1 Name: James O'Hara Address:
/
668 S. crooked Tree Path Homosassa, FL, 34448 TI rn General Comment Why should an application to up power be approved when the reactor is non operational? If this is allowed then FLP can charge upfront fees for an upgrade that may not take place.
SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM -03 Add=
- 5. 9P. //,
q https://www. fdms.gov/fdms-web-agency/component/contentstreamer?obj ectld=09000064... 02/06/2013