Letter Sequence Other |
|---|
|
Results
Other: L-2012-385, Florida Power & Light (Fpl)S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-2013-084, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-2013-192, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049), L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), L-2014-063, Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049), L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049), L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-2015-214, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), L-2015-215, Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049), L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan, ML15071A265
|
MONTHYEARL-2012-385, Florida Power & Light (Fpl)S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2012-10-25025 October 2012 Florida Power & Light (Fpl)S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-2013-084, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-2013-192, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)2013-06-18018 June 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049) Project stage: Other L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-08-28028 August 2013 First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other L-2014-008, Environmental Protection Plan Report, December 27, 2013, Unusual or Important Environmental Event - Turtle Mortality2014-01-0808 January 2014 Environmental Protection Plan Report, December 27, 2013, Unusual or Important Environmental Event - Turtle Mortality Project stage: Request L-2014-063, Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2014-02-26026 February 2014 Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) Project stage: Other L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2014-08-27027 August 2014 Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other ML15071A2652015-02-23023 February 2015 Fourth Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML15083A2642015-03-10010 March 2015 Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report Project stage: Request L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-2015-215, Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2015-08-20020 August 2015 Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other L-2015-214, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-25025 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 12015-11-12012 November 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 1 Project stage: Request L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan Project stage: Other ML16096A3382016-03-21021 March 2016 Revised FLEX Final Integrated Plan Project stage: Request ML16167A4732016-07-0505 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2015-11-12
[Table View] |
Text
0 June 18, 2013 FPL.
L-2013-192 10 CFR 2.202 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Florida Power & Light (FPL)/St. Lucie's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
References:
- 1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events dated March 12, 2012, Accession No. ML12056A045.
- 2. NRC Interim Staff Guidance JLD-ISG-2012-01, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External events," Revision 0, dated August 29, 2012, Accession No. ML12229A174.
- 3. NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide,"
Revision 0, dated August, 2012, Accession No. ML12242A378.
- 4. FPL Letter L-2012-385 dated October 25, 2012, FPL's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), Accession No. ML12300A421.
- 5. FPL Letter L-2013-084 dated February 28, 2013, Florida Power & Light (FPL)/St.
Lucie's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), Accession No. ML13063A026.
On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to FPL/St. Lucie. Reference I was immediately effective and directs FPL/St. Lucie to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference I requires submission of an Overall Integrated Plan by February 28, 2013. The NRC Interim Staff Guidance (ISG) (Reference 2) was issued August 29, 2012 which endorses industry guidance document NEI 12-06, Revision 0 (Reference 3) with clarifications and Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2013-192 Page 2 exceptions identified in Reference 2. Reference 3 provides direction regarding the content of this Overall Integrated Plan.
Reference 4 provided the FPL/St. Lucie initial status report regarding mitigation strategies, as required by Reference 1.
Reference 5 provided FPL/St. Lucie's Overall Integrated Plan, based on conceptual design information, for mitigation strategies pursuant to Reference 3.
The purpose of this letter is to inform the NRC about a change to the St. Lucie Plant Diverse and Flexible Coping Strategies (FLEX) Integrated Plan regarding the reactor coolant pump (RCP) seal configuration. Page 35 of the attachment in Reference 5 stated that the existing St.
Lucie RCP N-9000 seal packages would be modified to include the new Flowserve Abeyance seal. The revised St. Lucie strategy will be to maintain the current Flowserve N-9000 RCP seal configuration without the Abeyance seal modification. The existing St. Lucie RCP seal configuration is consistent with the N-9000 RCP seal configuration evaluated in WCAP-17601 -P, "Reactor Coolant System Response to the Extended Loss of AC Power Event for Westinghouse, Combustion Engineering and Babcock & Wilcox NSSS Designs." This revised St. Lucie FLEX approach will also make St. Lucie consistent with the other Combustion Engineering NSSS plants that currently utilize the Flowserve N-9000 seal. The most significant change to the FLEX plan will likely be to initiate the Reactor Coolant System cooldown earlier in the event. The specific changes to the St. Lucie Plant FLEX plan resulting from the decision not to install the Abeyance seals will be provided to the NRC in the August six-month update.
This letter contains no new regulatory commitments.
If there are any questions regarding this submittal, please contact Eric Katzman, St. Lucie Licensing Manager, at (772) 467-7748.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June I6, 2013.
jRespectfu ly submitted, Site Vice President St. Lucie Plant cc:
Director, Office of Nuclear Reactor Regulation NRC Regional Administrator NRC Resident Inspector