ML13308B676
| ML13308B676 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/13/1980 |
| From: | Baer R Office of Nuclear Reactor Regulation |
| To: | Scherer A ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| References | |
| NUDOCS 8002250156 | |
| Download: ML13308B676 (2) | |
Text
Distribution Docket File NRC PDR FEB Local PDR DFRoss DBVassallo Docket Nos. 50-361 SAVarga and 50-362 LWR #2 File RLBaer JLee HRood Mr. A. E. Scherer EShoaker Licensing Manager (9438-401)
JCooke Combustion Engineering, Inc.
MRushbrook 1000 Prospect Hill Road NSIC Windsor, Connecticut 06095 TIC
Dear Mr. Scherer:
ACRS(16.
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (San Onofre Nuclear Generating Station, Units 2 and 3)
By letter dated July 17, 1979, the Southern California Edison Company submitted "Test Report of the 16 x 16 Drop Tests," CEN-113(S)-P for San Onofre 2 and 3 and your related affidavit and requested that it be withheld from public dis closure pursuant to 10 CFR 2.790. A non-proprietary version of the report was also transmitted by Southern California Edison Company's letter.
Your affidavit stated that the reasons for requesting our withholding of this information were:
(1) the information is customarily held in confidence by your company and is not presently available in public sources; (2) the data provides you with a competitive advantage, resulting from your expenditure of thousands of man-hours of effort and tens of thousands of dollars. You believe that in order for your competitors to obtain this advantage, they would likely incur similar expense, time, research and development efforts.
We have reviewed your application and CEN-113(S)-P based on the requirements and criteria of 10 CFR 2.790 and have determined that the above-mentioned docu ment sought to be withheld contains trade secrets or confidential commercial or financial information.
We also have found at this time that the right of the public to be fully apprised as to the bases for and effects of the proposed action does not outweigh the demonstrated concern for protection of your competitive position. Accordingly, we have determined that CEN-113(S)-P should be withheld from public disclosure.
We therefore approve your request for withholding pursuant to Section 2.790 of 10 CFR Part 2 and are withholding CEN-113(S)-P as proprietary.
Withholding from public inspection shall not affect the right, if any, of per sons properly and directly concerned to inspect the document. If the need arises, we may send copies of the report to our consultants working in this area. We will, of course, assure that the consultants have signed the appro Ademtent 1ttl Vpup Ilr dd O:FF CE0
.I...
Su................................
4 ID A TE G
V..
9 NRc FORM 318 (9-76) NRcM 0240 U.S: 'GOVERNMENT PRINTING OFFICE: 1979-289-369'
Nr. A. E. Schorer FEB13 1 If the basis for withholdinq this information from public inspection should change in the future such that the information could then he made available for public inspection, you should promptly notify the NRC.
Sincerely, fPrginal signed by Robert Baer Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Fanagement ccs:
trs. James H. Drake Vice President Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 000 Poser:ead, California 91770 r.B.
- 14.
ia n Senior Vice President - Operations San Diego Cas and Electric Company 101 Ash Street P. 0. Pox 1831 San Diego, California 92112 OFFICE DP-M:LWR- -#2........
DPM:LWR 2 DPM: LWR #3.-.ELD
.DPMkWR
- 2 SURNAME Lee:ab:
.......HROOd.......
MRushbrok EShomaer..... PBar DATE
...2 -
80.........
2/-
./80_
.NRC FORM 3I8 (9-76) NRCM 0240.
U.S. GOVERNMENT PRINTING OFFICE:,1979-289-369