ML14175A663
| ML14175A663 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/18/1980 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML14175A664 | List: |
| References | |
| DPR-23-A-054 NUDOCS 8101290622 | |
| Download: ML14175A663 (2) | |
Text
.
- i.
a REGw UNITED STATES I.
NUCLEAB REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
54 License No. DPR-23
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power and Light Company (the licensee) dated September 28, 1979 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
810 g
-2
- 2. Accordingly, the license is amended by adding a new paragraph 3.G to Facility Operating License No. DPR-23 as follows:
3.G The licensee shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation.- This program shall include:
the identification of critical parameters, their sampling frequency, sampling points, and control band limits; requirements for the documentation and review of sample results; the identification of the authority responsible for the inter pretation of sample results; the procedures used to measure the critical parameters; and the procedures which identify the admini strative events and corrective actions required to return the secondary chemistry to its normal control band following an out of control band condition.
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION e v en
)arga, C e f Operating Reactors nch #1 Division of Licensina Date of Issuance:
December 18, 1980