ML15112A852

From kanterella
Revision as of 13:08, 10 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Issuance of Amend 68,68 & 65 to Licenses DPR-38, DPR-47 & DPR-55,respectively
ML15112A852
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/23/1979
From: Fairtile M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML15112A851 List:
References
NUDOCS 7903190130
Download: ML15112A852 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMUISSION DOCKETS NOS.

50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendments.Nos. 68, 68

, and 65 to Facility Operating Licenses Nos.

DPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company for operation of the Oconee Nuclear Station, Units Nos. 1, 2 and 3, located in Oconee County, South Carolina. The amendments become effective on February 23, 1979.

These amendments add a license condition to include the Commission approved security plan as part of each license.

The licensee's filing complies with the-standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR §51.5(d).(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of these amendments.

-2 The licensee's filing dated November 19, 1977, as revised February 1, 1978, September 15, 1978, and February 14, 1979, and the Commission's Security Plan Evaluation Report are being withheld from public disclosure pursuant to 10 CFR 2.790(d). The withheld information is subject to disclosure in accordance withthe provisions of 10 CFR §9.12.

For further details with respect to this action, see (1) Amendments Nos. 68,

68, and 65to Licenses Nos. DPR-38, DPR-47, and DPR-55, respectively, and (2) the Commission'-s related letter to the licensee dated FEB. UARy 2 1979*

These items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. and at the Oconee County Library, 201 South Spring Street, Walhalla, South Carolina. A copy of items (1) and (2) may be obtained upon request addressed to the U. S.

Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 23rd day of February 1979.

FOR THE NUCLEAR REGULATORY COMMISSION Morton B. Fairtile, Acting Chief Operating Reactors Branch #4 Division of Operating Reactors