L-79-130, Responds to IE Bulletin 79-09 Re GE Model AK-2 Circuit Breaker.Work Order Issued to Perform Checks Described in GE Svc Advice Ltr 175 & Checks Will Be Incorporated Into Switchgear Maint Procedure

From kanterella
Revision as of 16:31, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 79-09 Re GE Model AK-2 Circuit Breaker.Work Order Issued to Perform Checks Described in GE Svc Advice Ltr 175 & Checks Will Be Incorporated Into Switchgear Maint Procedure
ML17206A871
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/22/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-79-130, NUDOCS 7906260293
Download: ML17206A871 (2)


Text

"7l,it,(7- ~~OI4 ]

P,O, BOX 529l00, MIAMI,F L 33l52 FLORIOA POWER 4 LIGHT COMPANY May 22, 1979 L-79-1 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

RII:EHW 50-335/79-09 Florida Power 8 Light Company has reviewed the subject Bulletin regarding General Electric Model AK-2 circuit breakers.

We have determined that GE Model AK-2A circuit breakers are currently installed as part of the St.

Lucie Unit 1 reactor trip switchgear.

A plant work order has been issued to perform the checks described in GE Service Advice Letter No.

175 (CPDD) 9.3 during the current (1979) refueling outage.

These same checks will be incorporated into the periodic switch-gear mai ntenance procedure prior to the next

( 1980) refueling outage.

Very trad

yours, Vice President Advanced Systems

& Technology RE U/ DKJ/cph cc:

Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE