L-79-159, Advises That C-E Intends to Submit Generic Rept Requested by Item 1 of IE Bulletin 78-12B Re Atypical Weld Matl.Final Response Will Be Submitted by 790629

From kanterella
Revision as of 16:31, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That C-E Intends to Submit Generic Rept Requested by Item 1 of IE Bulletin 78-12B Re Atypical Weld Matl.Final Response Will Be Submitted by 790629
ML17206A904
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/11/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-79-159, NUDOCS 7907190060
Download: ML17206A904 (1)


Text

USNRQ REotP ATLANTA,6;E p~p't ~

79 JOM fry Af0; oq P.

O.

Box 529100

~mi, FIorida 33152

~eJ+~ p l~ y)l/li g

~ y

'~14M FLORIOA POWER S LIGMTCOMPANY June ll, 1979 L-79-159 Nr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.

S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Nr. O'Reilly:

Re:

RII:JPO 50-389 IE Bulletin 78-12B As stated in letter LD-79-024 dated Aptil 25, 1979 from Nr. A. E. Scherer,

.Licensing Manager, Combustion Engineering, Inc. to Nr. Harold D. Thornburg,

Director, NRC Division of Reactor Construction Inspection, Combustion Engineering intends to submit the generic report requested by Item 1 of.

IE Bulletin 78-12B by June 8, 1979 and will provide Florida Power 5 Light Company (FPL) with information so that we can respond to the Bulletin by June 29, 1979.

Accordingly, for St. Lucie Unit 2, FPL has established June 29, 1979 as the revised date for responding to IE Bulletin 78-12B.

r Very truly yours, 7jwWy pw Robert E. Uhrig Vice President Advanced Systems 8 Technology REU:TCG:cf cc:

Harold Reis; Esquire y 90vx90e$ Q OP$%XAE COPY PEOPLE... SERVING PEOPLE gj J