L-80-397, Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. No Valcor Engineering Corp Valves or Parts Are in Use at Facility

From kanterella
Revision as of 16:06, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. No Valcor Engineering Corp Valves or Parts Are in Use at Facility
ML17209A494
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/09/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-23, L-80-397, NUDOCS 8012310410
Download: ML17209A494 (2)


Text

KIltI.'N~JP.[ITIP(rIIFI1 F IIIj' P,O. IIOXS29100 MIAMI,FL 33 1 S2 CD

</1 lp~

Q~%g FLOHQ@QMEA I/+GIITCIS/CQPNY De mber Q 198(Rc=.,

L~

-397 ~

+PI Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Rei lly:

Re:

R JP 0-33ulletin 80-23 Florida Power 8 Light has reviewed the subject Bulletin and has determined that St.

Lucie Unit 1 does not use Valcor solenoid valves with Part Numbers V70900-21-1 and 21-3.

Five man hours were required to prepare this report.

Very truly yours, Robe t E. Uhrig

/'

C4-Vice President Advanced Systems 5 Technology REU/PLP/md cc:

Director, Division of Reactor Operations Inspection, Office of Inspection and Enforcement Harold F. Reis, Esq'uire iaolXS$ 3l~N <~-

PEOPLE... SEA VING PEOPLE

1 L

I'J