ML17209A822

From kanterella
Revision as of 16:02, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Date & Time Change to 810311-12 Meeting W/Util in Bethesda,Md to Provide Contractors Participating in Independent Design Review Pilot Program W/Info on Staff Scope of Review of Fsar.Agenda Encl
ML17209A822
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/09/1981
From: Nerses V
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8103170777
Download: ML17209A822 (7)


Text

MAR g

1981 Docket No.:

50-389 ee e -+.~. rees, i%re r~

4

\\,re i Ug+

MEMORANDUM FOR:

B. J. Youngblood,Chief,Licensing,Branchgo,. 1,PJ.,,...,.

FROM:

SUBJECT:

V. Nerses, Ppojectr Managey;,, LicensiygBt'anc)Po, 1,DL....,,

FORTHCOMING,,MEETINGWITH,FLORIPLPOIJERAND, L$6$T C+PPNY,...

DATE AND TIME:

LOCATION:

PURPOSE:

Wednesday,Marcher 11,,1981

Thursday, triarch 12, 1981 9:00 AM Room P-422, Phill,ips Building
Bethesda, Maryland err '4 4'e 4 'k

> rr 0 r ~

er> ee rr 5'

~

~ r ee

~ rr4 w v e y 1e rr s y,.p e er ='e re y e ee

'rrr ft r4' 4 9 'p er rr, cc rl 4, crt'r >r 'e ee tr e r ri ere y rr e,

+r r}y ~ +pc 4,

Provide., F(8L contracto} s, who ary,r.particr,ipatipgin an.,,

independent design review pilog, pl ogham,,information.,

on the staff's scope of review. of. theFS/R....,

~

e=

PARTICIPANTS:

NRC Staff,,,

' r'5 4r NW p4 V. Nerses, D. Shum, 0. Chopra.,p,Easl,ey.F J.Young)1ood, R. Tedesco, F. Rosa, W, Houston, T,. quay, A,. Ungaro...,....

G. Bradshaw, E. Dotson. Others,,.,,.,.,.,...,.,

Inde endent..Desi

n. Review Contractors...,,...

Bechtel EDS Nuclear quadrex "el'"*'IrO re%re 4 rretk+>> J

Enclosure:

Agenda for IDR Pilot Program Meeting V. Nerses, Project Manager Licensing Branch No.

1 Division of Licensing rlrrrerer Ierlr(

e-re e "reer er"r rrre 1)

~ ewer%rer 4 U t4 re el

'0 4 4 e. ee rr 1 r reweeergep 4r [terr. 9 r.pe<er'rr

~ "re

'e 4

'e

.e Vr 4 e r" ee ee rr II, r(%:

~

e rir ere erg' etc r

'e g

I ~ r OFFICEI SURNAME/

OATEN 3/9/81 DL:

BJY ungblood 3/

/81

~ rr e 4, wee r r er rrrr er ~ ~ r cree NRC FORM 318 80/801 NRCM 0240 OFFIC AL RECORD COPY o USGPO." 1980-829 824

84

AGENDA FOR IDR PILOT PROGRAM MEETING 3/11/81 A.

B.

C; D.

F.

3/12/81 A.

Nerses provide introduction to kick-off the meeting.

The introduction wil,l cover:

\\~

- purpose of meeting

- who the reviewers are, their background'and order of presentation

- ground rules for subsequent interfacing with reviewers"

. all interfaces by FP&L contractors are through the LPM for S.L.2 or his backup.

Chopra gives presentation on how he reviews AC power systems (SRP 8.3. 1),

onsite, ex'eluding the diesel generator.

guestion and answer. period on Chopra's presentation.

Bechtel discuss and compare their approach if significantly different.

Shum gives presentation on how he reviews containment cooling (6.2;2).

guestion and answer period on Shum's presentation.

guadrex discuss and compare their approach if significantly different.

Before adjouring the meeting, Nerses reviews any agreements.

Nerses provide introduction to kick-off the meeting.

The introduction will cover:

B.

C.

- purpose of meeting

- who the reviewers are, their background and order of presentation

- ground rules for subsequent interfacing with reviewers

. all interfaces by FP&L contractors are through the LPM for S.L.2 or his backup.

Shum gives presentation on how he reviews containment spray system (SRP guestion and answer period on Shum's presentation.

EDS Nuclear discuss and compare their approach if significantly different.

I 6.2.2).

i D.

Easley -gives presentation on how he reviews containment spray as a fission product clean-up system (6.5.2).

E.

guestion and answer period on Krug's presentation.

EDS Nuclear discuss and compare their approach if significantly different.

F.

Be'fore adjouring the meeting, Nerses review any agreements.

Or. Robert E.'hrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company P. 0. Box 52910'0 Miami, Florida 33152 cc:

Harold F.. Reis,.Esq.

Lowenstein, Newman, Reis, Axelrad 5 Tol.l.

1025 Connecticut

Avenue, N.

W.

Washington,'.

C.

20036 Norman A. Coll, Esq.

McCarthy, Steel, Hectory 8 Davis 1'4th Floor, First National Bank Building Miami, Flori da 33131 Mr. Martin H. Hodder 1131 N.

E.

86 Street Miami., Florida 33138 Dr. iDavid L. Hetrick Professor of Nuclear Engineering

'he University of Arizona Tucs'on, Arizona 85721 Dr. Frank F. Hooper School of Natural Resources University'of Michigan Ann Arbor, Michigan 48104 Resident Inspector St. Lucie Nuclear Power Station c/o U. S..Nuclear Regulatory Commission P. 0, Box 400 Jensen:Beach, Florida 33457

~e ~t

/

I

~

'p MEETING

SUMMARY

OISTRIBUTIDN

. +~

8 188)

CD k~Fi 1 NRC PDR Local POR T IC/NS IC/Tera NRR Reading LB¹1 Reading H. Denton E.

Case D. Eisenhut R. Purple B. J.

Youngblood A. Schwehcer F. Miraglia J. Miller G. Lainas R. Vollmer,'

J.

P. Knight

'R ~

Bosnak F. Schauer R.

E. Jackson Project Manager

Attorney, OELD M, Rushbrook oiE (3)

ACRS (16)

R. Tedesco N. Hughes VNerses I

M bcc:

Applicant 8 Servi ce List V. Nerses, P.

Check,-,A.

Ungaro, S. Salah, J.
Mowhton, D. Mu11er, J.

Youngblood, R. Tedesco, J. Knight, "J; Brammer, S.

Shum, J. Ridgely, R. Rothman, R: Vollmer, V. Noonan, M. Bradshaw, H. Denton, D. Eisenhut, R. Purple F.

W.

W.

R.

T.

L.

T.

W.

J.

S.

W.

T(

F.

D."

R.

C.

K.

G.

A.

D.

J, D,

P, D,

Rosa, Butler Kreger'ouston Murphy Rubenstein

'peis Johns'ton Stolz Hanauer Gammill Murley Schroeder Skovholt Ernst Baer Berlinger,

Kniel, Knighton Thadani Tondi Kramer'assallo Collins Ziemann G. Lear V.

Noonan'.

Pawlicki V. Benaroya Rosztoczy W.

Haass D. Muller R. Ballard W.

Regan D.

Ross P.

Check R. Satterfi

0. Parr