Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARL-99-146, Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld1999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld L-99-079, Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status1999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements L-99-099, Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements1999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. L-99-010, Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution1999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution L-98-308, Application for Amend to License NPF-16,revising Index Page Iii,Ts 1.10,TS 2.1.1.2,Bases 2.1.1,Bases Figure B2.1-1,Bases 2.2.1,TS 3.1.1.1/4.1.1.1.1,TS 3/4.1.1.2,TS 3.1.2.2,TS 3.1.2.4,TS 3.1.2.6,TS 3.1.2.8 & Bases 3/4.1.1.1.Rept Encl1998-12-18018 December 1998 Application for Amend to License NPF-16,revising Index Page Iii,Ts 1.10,TS 2.1.1.2,Bases 2.1.1,Bases Figure B2.1-1,Bases 2.2.1,TS 3.1.1.1/4.1.1.1.1,TS 3/4.1.1.2,TS 3.1.2.2,TS 3.1.2.4,TS 3.1.2.6,TS 3.1.2.8 & Bases 3/4.1.1.1.Rept Encl L-98-279, Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position1998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 L-98-283, Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-11998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position L-98-211, Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs1998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 L-98-125, Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.11998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 L-98-072, Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures1998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews L-98-115, Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions1998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions L-98-130, Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plants Operating Crews1998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plants Operating Crews ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 L-98-031, Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 11998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 L-97-325, Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity1997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values L-97-280, Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values1997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values L-97-296, Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement1997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement L-97-215, Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section1997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section L-97-191, Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 19961997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 L-97-158, Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis1997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis L-97-134, Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases1997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases L-96-333, Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits1996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits L-96-298, Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values1996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values L-96-256, Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs1996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel L-96-222, Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel1996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel L-96-245, Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria1996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria L-96-244, Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria1996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl L-96-141, Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl1996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes L-95-327, Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes1996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes L-95-228, Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities1995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities L-95-246, Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS1995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS L-95-215, Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-14321995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 L-95-233, Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-071995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 1999-08-18
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17241A4781999-10-0404 October 1999 Amend 104 to License NPF-16,removing Redundant Boron Concentration Monitoring Requirements Specified for Modes 3-6 Contained in TS 3/4.1.2.9,accomplished by Deleting TS 3/4.1.2.9 L-99-146, Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld1999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A4051999-07-0202 July 1999 Amends 162 & 103 to Licenses DPR-67 & NPF-16,respectively, Consisting of Changes to App B, Environ Protection Plan Non-Radiological) of TS L-99-079, Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status1999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements L-99-099, Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements1999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17241A3981999-05-21021 May 1999 Draft Amends to Licenses DPR-67 & NPF-16,consisting of Changes to App B (App B,Part II for Unit 1), Environ Protection Plan (Non-Radiological), of TSs in Response to Application & Suppl ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. L-99-010, Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution1999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution ML17229A9791999-01-0505 January 1999 Amend 159 to License DPR-67,revising Table 2.2-1 Notations in TS Section 2.2.1,Reactor Trip Setpoints L-98-308, Application for Amend to License NPF-16,revising Index Page Iii,Ts 1.10,TS 2.1.1.2,Bases 2.1.1,Bases Figure B2.1-1,Bases 2.2.1,TS 3.1.1.1/4.1.1.1.1,TS 3/4.1.1.2,TS 3.1.2.2,TS 3.1.2.4,TS 3.1.2.6,TS 3.1.2.8 & Bases 3/4.1.1.1.Rept Encl1998-12-18018 December 1998 Application for Amend to License NPF-16,revising Index Page Iii,Ts 1.10,TS 2.1.1.2,Bases 2.1.1,Bases Figure B2.1-1,Bases 2.2.1,TS 3.1.1.1/4.1.1.1.1,TS 3/4.1.1.2,TS 3.1.2.2,TS 3.1.2.4,TS 3.1.2.6,TS 3.1.2.8 & Bases 3/4.1.1.1.Rept Encl L-98-279, Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position1998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9191998-11-24024 November 1998 Amend 98 to License NPF-16,revising Table 2.2-1 Notations in TS Section 2.2.1 & Table 3.3-1 Notations in TS Section 3/4.3.1,by Replacing Term Thermal Power with Explicit Parameters Based on Output of Excore Neutron Flux Monitors ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 L-98-283, Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-11998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8841998-10-16016 October 1998 Amends 157 & 96 to Licenses DPR-67 & NPF-16,respectively, Revising TS Action Statements & Certain SRs of TS 3/4.5.1, Sits L-98-211, Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs1998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A8341998-08-10010 August 1998 Amends 156 & 94 to Licenses DPR-67 & NPF-16,respectively, Revising Surveillance Requirements of TS Section 4.11.2.5.1, Explosive Gas Mixture, to Add Ref to UFSAR for Clarification of Alternative Monitoring Method ML17229A8251998-07-30030 July 1998 Amends 155 & 93 to Licenses DPR-67 & NPF-16,respectively, Revising Administrative Controls,Unit Staff Section 6.2.2.f of TS to Authorize Use of Various Controlled Shift Structures & Durations During Nominal Work Wk ML17229A8221998-07-24024 July 1998 Amend 92 to License NPF-16,modifying TSs for Selected cycle-specific Reactor Physics Parameters to Refer to St Lucie Unit 2 Core Operating Limits Rept for Limiting Values L-98-125, Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.11998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 L-98-130, Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plants Operating Crews1998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plants Operating Crews ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews L-98-115, Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions1998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions L-98-072, Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures1998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures L-98-031, Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 11998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17229A6571998-02-25025 February 1998 Amends 153 & 91 to Licenses DPR-67 & NPF-16,respectively, Relocating Inservice Testing Program Requirements from TS 4.0.5 to Administrative Controls Section in Units 1 & 2 TS L-97-325, Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity1997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values L-97-280, Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values1997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement L-97-296, Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement1997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4911997-10-0202 October 1997 Amend 90 to License NPF-16,changing TSs in Response to 970801 Application Re Extending Surveillance Interval for ESFAS to Refueling Interval on Staggered Test Basis L-97-215, Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section1997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section L-97-191, Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 19961997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 L-97-158, Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis1997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases L-97-134, Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases1997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A3411997-05-16016 May 1997 Amend 151 to License DPR-67,deleting Footnote Which Requires Reactor Thermal Power to Be Limited to 90% of 2700 Megawatts Thermal for Cycle 14 Operation Beyond 7000 Effective Full Power Hours ML17229A2881997-04-0101 April 1997 Amend 150 to License DPR-67,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Refer to Facility Core Operating Limits Rept for Limiting Values ML17229A2251997-02-10010 February 1997 Amends 148 & 87 to Licenses DPR-67 & NPF-16,respectively, Revising Plant TSs to Remove Inconsistencies Between Definition of Core Alterations & Applicability,Action & SRs of Two Specs L-96-333, Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits1996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits L-96-298, Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values1996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values L-96-256, Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs1996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs L-96-222, Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel1996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel 1999-08-18
[Table view] |
Text
,i
~kr l
~
I REQULAT INFORMATION DISTRIBUTIO YSTEI'1 (RIDS)
ACCESSION NBR: 8604280076 DOC. DATE: 86/04/21 NOTARIZED: YES FACIL:50-389 St.
Lucie Planti Unit 2> Florida Power 5.Light Co.
AUTH. NANE AUTHOR AFFILIATION WOODY> C. O.
Florida Power 5 Light Co.
RECIP. NANE RECIPIENT AFFILIATION THADANIiA. C.
PWR Prospect Directorate 8
DOCKET I 05000389
SUBJECT:
Application to amend License NPF-ill deleting Condition 2. C. 19 to permit discharge of fuel 3 operation listed limits. Approval requested Just if1 cat ion enc I.
License at end of Cg c le bg 870501.
DIETRIDOTION CODE:
AOOID COPIEE RECEIVED: LTR Q ENCL Q SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAI'1E PWR-8 ADTS PWR-8 PEICSB PWR-8 PDS PD 01 PWR-8 PEICSB INTERNAL: ADN/LFNB N
FT/TSCB EQ FI 04 COPIES LTTR ENCL 1
0 2
2 5
5 1
1 0
1 1
1 RECIPIENT ID CODE/NANE PWR-8 EB PWR-8 FOB BELLS> D PWR-8 RSB ELD/HDS2 NRR/ORAS RQN2 COPIES LTTR ENCL 1
1 0
0 EXTERNAL: 24X LPDR NSIC 03 05 1
1 1
1 EQhQ BRUSKEi 8 NRC PDR 02 1
1 1
1 TOTAL NUlfBER OF 'COPIES REQUIRED:
LTTR 24 ENCL 20
C H
l '$)5 H
tt H** l
(Hl tl t I'
I t*$
HP I*'<1 PH IH 1I I,
~
fI H
)
H H
I
~
HH
~,
H H
I H,"
. 'I r
).
)Hg '"+C, '
>(H
'I H 'tt g 5()
IH H"
l I I,'l.
~
QH H
HH I
HH I H ilI flf)gt
)H$
H H',IHH C+PPH H,
~
I
<<yg lli/~
~or.,~y~
FLORIDAPOWER 5 LIGHTCOMPANY APR 2 1 1888 L-86-I73 Office of Nuclear Reactor Regulation Attention:
Mr. Ashok C. Thadani, Director PWR Project Directorate II8 Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Thadani:
Re:
St. Lucie Unit No. 2 Docket No. 50-389 NPF-I 6 License Condition 2.C. I 9 In accordance with IO CFR 50.90, Florida Power 6 Light Company (FPL) submits herewith three signed originals and forty copies of a request to delete License Condition 2.C. I9 from Facility Operating License NPF-l6.
License Condition 2.C.I9 requires FPL to submit and obtain NRC approval of a new analysis that addresses potential gas-gap releases for extended burnup fuel.
The attached analysis presents the analytical methods and results for radioactive fission product activity in the fuel rod gas gap for extended burnup fuel (>38,000 MWD/MTU).
This report shows that the results of the FSAR gas-gap-activity analysis are conservative for fuel assembly burnups out to 60,000 MWD/MTU.
FPL requests NRC approval of the attached analysis and deletion of License Condition 2.C.I9 in order to permit discharge of fuel at the end of Cycle 3
operation that may exceed 38,000 MWD/MTU. Approval is requested by May I, I 987.
The proposed license amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power Bc Light Company Nuclear Review Board.
ln accordance with I 0 CFR 50.9 l(b)(l), a copy of the proposed amendment is being forwarded to the state designee for the State of Florida.
FPL Check No. 1066 is attached as remittance of the fee specified in IO CFR I70.2I.
Very truly yours, C. O. Wo Group V President Nuclear Energy goo I af g 86042B0076 860421 PDR ADOCN, 05000389 RJS4/006/
I PEOPLE... SERVING PEOPLE COW/MAS/gp Attachmen? s cc:
Dr. J. Nelson Grace, USNRC, Region II Mr. Allan Schubert, Florida Dept. of Health & Rehabilitative Services Harold F. Reis, Esquire, Newman 8< Holtzinger
STATEOF FLORIDA
)
)
ss0 COUNTY OF DADE
)
C.O. Woody, being first duly sworn, deposes and says:
That he is a Group Vice President of,Florida Power R Light Company, the licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
C.O. Wood Subscribed and sworn to before me this "r, rrrDrryv, dsy'pf
', 1986.
";-",i%6TAR.Y>&iJSLIC,in and for the County of
"<<:-",.Oade',;Sg~tc.'f Florida.
IIII NOTARY PUBLIC STATE OF FLBRIOA HY CONNISSION EXP SEPT 1B,19B9 y -mm ssIOn eXpireS:
BDNOED THRU GENERAl INS. UND.
~
~-
~
~
~ '
~
I 4
Safet Evaluation for a Pro osed Chan e to the St. Lucie Unit 2 0 eratin License on Maximum Assembl Dischar e Burnu I.
Introduction The purpose of this evaluation is to address License Condition 2.C.19, which states. that:
"Prior to storing extended burnup fuel in the modified spent fuel pool (greater than 38,000 Mw-days/Metric ton) the licensee must submit and obtain approval of.a new analysis that addresses the potential of large gap releases for the extended burnup fuel."
This license condition was introduced a's a result of the NRC's review of the fuel storage rack analysis that CE provided for St. Lucie Unit 2 (Reference 1).
The NRC stated that the fission gas releases being calculated by the various industry fuel performance models available at that time, did not bound data the NRC had which indicated fission gas releases at high burnups well.in excess of the 10% specified in the Standard Review Plans.
As a result, during the review of the re-rack submittal, the staff identified a concern regarding the impact of high burnup fuel gas gap releases resulting from a fuel handling accident.
To address this concern, FPL contracted Combustion Engineering to perform a safety analysis in order to demonstrate that the extended burnup fission gas release was bounded by the FSAR gas gap activity analysis.
The results of that analysis are discussed in the next section of this report.
II.
Safet Evaluation The safety analysis performed in support of the proposed deletion of License Condition 2.C.19 can be found in attachment 2.
The main emphasis of the analysis was to calculate the release fraction of I-131, which is the controlling
- isotope, at high burnup regimes
(>38,000 MWD/MTU) and to compare the resulting value to that assumed in the FSAR.
The FATES3A code was used in conjuction with the ANSI/ANS-5.4 standard to calculate fuel temperatures (Figure
- 2) and release fractions for various burnup regimes.
In addition, a rod power history (Figure
.1) which is typical of St. Lucie Unit 2 and is expected to generically bound the fuel rod power history for future cycles, was used in this analysis.
Table 2 lists'he release fractions at an exposure of 43,396 MWD/MTU.
The calculated release fraction of 3.64
'x 10 2 in conjuction with a lower I-131 inventory than
~
0 that used'n the FSAR (due to the lower 8.38 kw/ft rating used in this analysis Figure 1), results in a reduction of the I-131 source term to an equivalent release fraction of 3.02 x 10 2.
This release fraction is approximately 3 times less than the FSAR assumed source term (10%).
The higher kw/ft rating used in the original FSAR analysis (10.08 kw/ft) was overly conservative due to the fact that at the time the FSAR analysis was performed, it was not clear what the fuel management plans or operating strategies would be beyond Cycle 1.
Additional fission gas release calculations performed at burnups of 52,380 MWD/MTU and 60,000 MWD/MTU indicate that the release fractions decrease with increasing burnup.
In particular, the release fractions at these higher burnups, which are shown on Tables 3 and 4, are about a factor of 23 smaller than the value quoted in the FSAR.
This effect is due to the decreasing linear heat rate as a
function of increasing burnup.
Based on the foregoing discussion, it is concluded that the existing St.
Lucie Unit 2 gas gap activities conservatively bound the gas gap activities for fuel assembly burnups out to 60,000 MWD/MTU. Finally, the No Significant Hazards Evaluation for this proposed License Amendment can'e found in Attachment l.
References Proposed License Amendment Spent Fuel Pool Rerack, St. Lucie Unit 2 Docket No. 50-389, March 13, 1984.
2.
Letter J.
L. Perryman (FPL) to F.
Z. Stiteler (CE), "St.
Lucie Unit 2 Extended Burnup Gas Gap Activity Release",
FRN-85-193, July 9, 1985.
3.
Letter E. L. Trapp (CE) to J.
L. Perryman (FPL), "St.
Lucie Unit 2 License Condition 19 on Extended Burnup Fuel Gas Gap Activity Release",
F2-CE-R-036, October 1,
1985.
ATTACHMENT I NO SIGNIFICANT HAZARDS EVALUATION RJS4/006/2
NO SIGNIFICANT HAZARDS CONSIDERATION The requested amendment to the St. Lucie Unit 2 operating license deletes License Condition 2.C.19 which limits the burnup of fuel stored in the spent fuel pool to 38,000 MWD/MTU.
An evaluation of this request has been performed to demonstrate that no significant hazards consideration exists',
based on a comparison with the criteria of 10CFR50.92 (C).
The following evaluation demonstrates (by reference to the analysis contained in the attached Safety Analysis Report) that the proposed amendment to remove License Condition 2.C.19 does not exceed any of the three significant hazards consideration standards.
1.
The requested change does not increase the probability or consequences of accidents previously analyzed.
Since the configuration of the plant and the mode of operation remain unchanged, the probability of accidents previously analyzed remains unchanged.
In addition,. as described in the attached safety analysis report, the radiological consequences of a fuel handling accident, whose results would be affected by increasing the assembly burnup beyond the current 38,000 MWD/MTU limit, are bounded by previous FSAR analysis.
In particular, the analysis findings indicate that the I-131 gas gap release fractions decrease with increasing burnup and that the release fractions are a
factor of about twenty-three (23) smaller than the FSAR
-source term for an assembly burnup of 60,000 MWD/MTU.
Based on these findings, the proposed deletion of License Condition 2.C.19 does not involve any increase in the probability or consequences of an accident previously evaluated.
2.
The requested change does not increase the potential for accidents different from any accident previously considered because the plant configuration and the manner in which it is operated remain the same.
In particular, the proposed change does not constitute. any change in the procedures for plant operation or hardware and therefore will not create the possibility. of a new or different. kind of accident from any accident previously evaluated.
3.
The requested change does not reduce the safety m'argin because it has been shown in the safety analysis that the calculated release fraction for the controlling isotope is significantly lower than the release fraction assumed in the St. Lucie Unit 2 FSAR.
Since the results are bounded by the FSAR fuel handling analysis, the proposed change
I'.
E
to delete the 38<000 MWD/MTU burnup limit will not involve a reduction in a margin of safety.
The proposed amendment is similar to example (iv), presented in the staff guidance for determination of no significant hazards amendments (48 FR 14870 dated April 6, 1983), of amendments not likely to involve significant hazards considerations:
(iv) A relief granted upon demonstration of acceptable operation from an operating restriction that was imposed because acceptable operation was not yet demonstrated.
This assumes that the operating restriction and the criteria to be applied to a request for relief have been established in a prior review and that it is justified in a satisfactory way that the criteria h'ave been met.
In summary, it has been shown that the proposed deletion of License Condition 2.C.19 does not involve a significant hazard, as discussed in 10CFR50.92.
Based on the attached Safety Evaluation, it is concluded that the health and safety of the public will not be endangered by the proposed change.
ATTACHMENT 2 SAFETY EVALUATION RJS4/006/3
Analysis Methods and Calculated Fuel Rod Gas Gap Radioactive Fission Product Activity Results For Burnups in Excess of 38,000 MWD/MTU The radioactive fission product activity in the fuel rod gas gap has been calculated for St. Lucie 2 fuel rod average burnups out to 60,000
/MTU.
These calculated fuel rod gas gap activities are for use in the fuel handling accident.
The fission gas release was calculated using the methods described in Reference 1.
The controlling activity as far as the off-site dose from the fuel handling accident is that for I-131.
The release fraction assumed in these analyses is based on the peak power rod history for St. Lucie 2 Cycle 3
shown in Figure 1.
This rod power'history was generated in such a way that it is expected to bound the fuel rod power histories for future cycles of St. Lucie 2.
This data was input to C-E's FATES 3A fuel performance code (Reference 2).
The fuel rod radial temperature distributions as a function of rod average burnup and local power levels shown in Figures 2 and 3 were generated by FATES 3A.
Since the analysis was aimed at a determinition of the gas gap activities for the fuel assembly as a whole, the peak rod linear heat rate was multiplied by a factor of 0.955 to scale from the peak rod values to the fuel assembly average values.
Also, since the rod power history of Figure 1 is for the axially averaged linear heat rate, the average linear heat rates in the central axial regions of the fuel will be higher.
To account for these axial variations in the linear heat
- rates, the average kw/ft for the rod was assumed to be the value which would exist in nodes 4-17 (i.e. the central rod region axially).
The resultant linear heat rates are displayed in Table 1.
The calculated gas release fraction from these central axial nodes was assumed to exist over the entire length of the rod.
This is conservative since the release fraction from the end nodes (1-3 and 18-20) would be much less than the release fraction based on the higher linear heat rate in the central axial nodes.
To perform these gas gap activity calculations the fuel rod was divided into 6 equal volume radial nodes.
Release fractions were then calculated at 43,396, 52,380 and 60,000 KK/MTU.
The fuel temperature used to calculate the release fraction between a burnup of 35,849 and 43,396 MWD/MTU was conservatively taken from the breakpoints shown on Figure 2, where the fuel temperature distribution at the end of this burnup range is shown.
The temperatures assumed correspond to 8.38 Kw/ft (see Figure 2).
Note that 8 kw/ft could have been used in this calculation (i.e., 8.38 kw/ft multiplied by the 0.955 factor).
- However, a value of 8.38 kw/ft was assumed for conservatism.
The release fraction for each of the the radial regions, and for the radial average over the rod, are shown in Table 2.
l7
~
~
Similarly, the fuel temperature used to calculate the release fraction between a burnup of 43,396 and 52,380 MWD/MTU was taken from the break points on Figure 3 and correspond to 6.56 kw/ft (i.e., 6.87 multiplied by the 0.955 factor).
The release fractions for the 52,380 MWD/MTU burnup were calculated in the same manner as described for the 43,346 MWD/MTU burnup based on these data.
The resultant release fractions are shown in Table 3..
The god radial average release fraction was calculated to be 4.83 x 10, as shown on Table 3.
To determine the corresponding release fractions over the interval between 52,380 and 60,000 MWD/MTU it was assumed that the fuel temperatures from the 52,380 MWD/MTU time point also apply at 60,000 MWD/MTU.
(Note that this sort of extrapolation was necessary to extend the available data.)
The 52,380 MWD/MTU time point data is fudged to be conservative anyway since the fuel and clad will be in contact by 52,380 MWD/MTU.
Therefore, the temperatures at a given kw/ft, and the kw/ft value itself, would not be expected to change significantly between 52,380 and 60,000 MWD/MTU.
Based on these engineering judgements, and.a kw/ft value of 6.30 (i.e., the assumed kw/ft is the 6.54 kw/ft value shown on Figure 3 multiplied by the 0.955 factor discussed above),
the 60,000 MWD/MTU release fractions were calculated.
The calculated release fractions at 60,000 MWD/MTU are shown in Table 4.
The god radial average release fraction was calculated to be 4.65 x 10 as shown in Table 4. It should be noted that this release fraction is not as much lower than the one at 52,380 MWD/MTU as one would expect based on the 0.24 reduction in kw/ft.
This is the case because the enhanced fission gas release at the higher burnup essentially negates the benefit of the kw/ft reduction.
The I-131 inventory quoted in the St. Lucie 2 FSAR was calculated based on 10.08 KW/ft rather than the linear heat rates used in these analyses.
The lower linear heat rates reduce the inventor'y for the 8.1 day I-131 to 83 percent of the FSAR values by the 43,396 MWD/MTU burnup.
As a result, the I-131 source-term is reduced to an equivalent release
-2 fraction of 3.02 x 10 by 43,396 MWD/MTU.
This release fraction is a factor of 3.3 less than in the FSAR source term.
The release fractions at the higher burnups are an even smaller fraction of the FSAR value.
For instance, at 60,000 MWD/MTU, the I-131 release fraction is about a
factor of 23 smaller than the value quoted in the FSAR.
In conclusion, this analysis has demonstrated that the existing St.
Lucie 2 FSAR gas gap activities conservatively bound those for fuel assembly burnups out to 60,000 MWD/MTU.
References:
1.
"Method for Calculating the Fractional Release of Volatile Fission Products from Oxide Fuel," ANSI/ANS-5.4-1982.
2.
CEN-161(B)-P, "Improvements to Fuel Evaluation Model,"
Combustion Engineering, Inc., July 1981.
0 I
TABLE 1
ST. LUCIE 2, CYCLE 3 POWER FALL OFF HISTORY ASSUMED IN THESE GAS GAP ACTIVITY ANALYSES ROD AVG BURNUP LOCAL LINEAR HEAT RATE 29057 33962 35849 43396 45283 47170 49057 50943 52830 54717 56604 60000 NODES 1,20 2,19 3,18 4-17 5.47 7.74 8.50 8.92 5.47 7.74 8.50 8.92 5.36 7.58 8.33 8.74 5.14 7.27 7.99 8.38 4.98 7.04 7.73 8.11 4.76 6.73 7.39 7.76 4.54 6.42 7.05 7.40 4.32 6.11 6.71 7.04 4.21 5.96 6.54 6.87 4.16 5.88 6.46 6.78 4.10 5.80 6.37 6.69 4.05 5.73 6.29 6.60
- Nodes 1 and 20 are at the fuel rod ends.
TABLE 2 RELEASE FRACTIONS AT 43396 MWD/MTU Radial Region
- power of ten Average Release Fraction 1.53(-I)*
5.74(-2) 5.92(-3) 1.55(-3) 2.06(-4) 1.63(-4)**
3.64(-2)
- This is the calculated low temperature release which is higher than the calculated diffusion release fraction.
TABLE 3 Release Fractions of 52,830 MWD/MTU Radial Re ion Release Fraction Average 2.25 (-2)*
4.50 (-3) 1.35 (-3) 3.01 (-4) 1.63
(-4)~~~
1.63 (-4)**
4.83
(<<3)
Power of ten.
- This is the calculated low temperature release which is higher than the calculated diffusion release fraction.
TABLE 4 Release Fractions at 60,000 MWD/MTU Radial Re ion Release Fraction Average 2.04 (-2)*
5.48 (-3) 1.26 (-3) 4.22 (-4) 63
( 4)**
1.63 (-4)**
4.65 (-3)
Power of ten.
See explanation in Table I.
FIGURE
.1 ST LUCIE Z,CYCLE 3, POHER HISTORY PEAK ROD POWER VS. ROD AVO BURNUP fO 0
80 40 (Thous andsj ROD AVERAGE'E BURNUJ,NlFD/MTU 60
P t
FIGURE 2
BOD AVG BU-43396 NJORD/NTU 1.9 1.B 1.7 O.B 0.7 0.6' O.Z 0.4 0.6 O.B EUEI DIA FRACTION 0
G. f4 kg/ft
+
7.27 kw/ft 0
7.99 kM/ft 6
8.38 ke/ft Nodes 1,20 Nodes 2,19 Nodes 3,]8 Nodes 4-17
FIGURE 3 ST LUCIE 2, CI 3 FUEL TEMP'ESTURE ROD AVG BU52830 M1YD/N'2'U 2.1 1.9 1.8 0
1.7 1.8 Q
1.5 E
gd1.4 1.2 0.9 0.8 0.7 0.8 0.2 0.4 0.6 0.8 o
421 FUEL DIA FRACFION
+
5.98 o
654 6.87
0
PROPOSED OPERATING LICENSE CONDITION AMENDMENT