L-87-303, Informs That Util Plans to Complete Implementation of Mods to Structural Steel Support Fireproofing in Fire Area M & Rooms W/O Sprinkler Protection in Fire Areas A,C,H & O by 880402,per Util

From kanterella
Revision as of 14:56, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Util Plans to Complete Implementation of Mods to Structural Steel Support Fireproofing in Fire Area M & Rooms W/O Sprinkler Protection in Fire Areas A,C,H & O by 880402,per Util
ML17219A707
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/23/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-303, NUDOCS 8707270288
Download: ML17219A707 (4)


Text

ULA

!Y INFORMATION DISTR JTI YSTEM (RIDB)

ACCESSION NOR:8707270288 DOC. DATE: 87/07/23 NOTARIZED:

NO FACIL: 50-38'7 St.

Lucie Planti Unit 2i Florida Power 8c Light Co.

AUTH. NAME AUTHOR AFFILIATION WOODY'. O.

Florida Pacer 4 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch

<Document Control Desk)

DOCKET 8 05000389

SUBJECT:

Informs that util plan to complete implementation of mods to structual steel support fireproofing in fire area M 5 rooms e/o sprinkler protection in fire areas Ai Ci Hi 0 bg 880402.

DISTRIBUTION CODE:

AOObD COPIES RECEIVED: LTR + ENCL ~" SIZE:

/

TITLE: OR/Licensing Submittal: Fire Protection NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA TOURIGNYi E

'COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD COPIEB LTTR ENCL INTERNAL: ARM/DAF/LFMB NRR WHITNEY' N

/PBB G

0l NRR WERMEILa J NRR/DEST/*DS OGC/HDS2 RES/DE/EIB EXTERNAL'PDR NBIC NRC PDR TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL

~ 0

~ 1 0

l

'4 4g

pic Ib 6

+/1mA4 FLORIDAPOWER 8( LIGHTCOMPANY JULY 83 III81 L-87-303 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 RE:

St. Lucie Unit 2 Docket 50-389 Fire Protection Technical Deviation Gentlemen:

By letter dated January l2, l987 (L-87-20), Florida Power & Light Co. (FPL) provided the schedule for the engineering associated with modifications to Structual Steel Support fireproofing in fire area M and rooms that do not have sprinkler protection in fire areas A, C, H, O.

FPL plans to complete the implementation of the modifications by April 2, l988.

The roving fire watch patrolling the above areas discussed in L-87-20 will remain in effect until the modifications are complete.

Should you require any additional information please contact us.

Very truly yours, C.O.

oo Group V ce resident Nuclear nergy COW/GRM/gp cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant r oqovo7o>oa aooooosso (,

)

870723 pDR ADOCt pDR

.F GRM I /02 I/I PEOPLE... SERVING PEOPLE

11 e-Hn H

Yi H

I II,I,,

II I 1

')3 *'

H

~

H II II I

I II H

d g

A H

'H 'H Hk

~ II I

~

~

jl HWI A

~ II H 1' 11 fji I

k

~

H Ital H

4

~

ll g I

P H

1 4

4 I