L-88-539, Forwards Response Schedule Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment

From kanterella
Revision as of 14:34, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Response Schedule Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment
ML17222A635
Person / Time
Site: Saint Lucie  
Issue date: 12/27/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-88-14, L-88-539, NUDOCS 8901030330
Download: ML17222A635 (3)


Text

. -<CCZ1ZMTED DIFIRIBUZON DEME STRXTION SYSTEM REGUDAT+ INFORMATION "DZSTRZBUTZOtYSTEM (RZDS)

ACCESSION NBR:8901030330 DOC.DATE: 88/12/27 NOTARIZED:

NO FACIL'!50-335 St. Lucie Plant, Unit 1, Florida Power a Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

.AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000335 05000389

SUBJECT:

Forwards response schedule re Generic Ltr 88-14, "Instrument Air Supply Sys Problems Affecting Safety-Related Equipment."

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR l ENCL ~

SIZE:

TITLE: OR Submittal:

General Distribution NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 NUDOCS-ABSTRACT Q~GF IL 01 COPIES LTTR ENCL 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 2

2 6

6 ARM/DAF/LFMB 1

0 1

1 NRR/DEST/CEB 8H 1

1 1

1 NRR/DEST/MTB '9H 1

1 1

1 NRR/DEST/SICB 1

1 1

1 NRR/PMAS/ILRB12 1

1 1

1 OGC/HDS2 1

0 1

1 RES/DSIR/EIB 1

1 h

EXTERNAL: LPDR NSIC 1

1 1

1 NRC PDR 1

1 R

NOIR 'IO ALL 'KIDS" RECIPIENXS:.

PIZASE HELP US 10 REDUCE RMBBEi CXRZACZ 'IHE DOCUMEÃ1'ON'HRL DESKF ROON P1-37 (EXT. 20079)

TO EZZMZNATE KKR NAME FRCH DISTEGBUTIGN LISTS MR DOCUK MZS KRJ DON'T HEEDf TOTAL NUMBER OF COP1ES REQUIRED:. LTTR'6 ENCL 23

P.O. Box14000, Juno Beach, FL 33408-0420

'"-"~MRI:g C 7 1989 L-88-539 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Instrument Air Supply System Problems Affecting Safet -Related E ui ment Generic Letter 88-14 Florida Power & Light Company (FPL) has received the subject Generic Letter (GL) dated August 8, 1988, and is taking action and performing verification requested by it.

Due to outage schedules and pre-planned hardware modification, FPL will not respond to the GL by its February 19,

1989, due date.

FPL's detailed schedule for response is attached.

This response schedule has been discussed with the NRC staff.

Please contact us if you have any questions about this schedule.

Very truly yours, W. F.

Conway Senior Vice President

- Nuclear WFC/EJW/cm Attachment cc:

Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 8901030330 88i227 PDR ADOCK 05000335 P

PNU EWGL8814 an FPL Group company

Res onse Schedule St. Lucie Units 1 and 2

Generic Letter 88-14 Item 1 Instrument Air Supply System Problems Affecting Safety-Related Equipment Verification by test that actual instrument air quality is consistent with the manufacturer's recommendation for individual components served.

Complete

Response

June 30, 1989 Item 2.

Verification that maintenance practices, emergency procedures, and training are adequate to ensure that safety-related equipment will function as intended on loss of instrument air.

Complete

Response

March 15, 1989 Item 3.

Verification that the design of the entire instrument air system including air or other pneumatic accumulators is in accordance with its intended function....

Complete

Response

March 15, 1989

.... including verification by test that air-operated safety-related components will perform as expected in accordance with all design-basis

events, including a

loss of the normal instrument air system....

Conduct complete valve testing and integrated loss of air test (as and if required)

St. Lucie Unit 1:

May 1990 (projected)

St. Lucie Unit 2:

December 1990 (projected)

....This design verification should include an analysis of current air operated component failure positions to verify that they are correct for assuring required safety functions.

Complete

Response

March 15, 1989 Item.

In addition to the above, each licensee/applicant should provide a discussion of their program for maintaining proper instrument air quality.

Complete

Response

March 15, 1989 EWGL8814