ML17223A521

From kanterella
Revision as of 14:21, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-335/89-30 & 50-389/89-30 on 891212-900108.No Violations or Deviations Noted
ML17223A521
Person / Time
Site: Saint Lucie  
Issue date: 02/07/1990
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17223A522 List:
References
NUDOCS 9002260301
Download: ML17223A521 (3)


See also: IR 05000335/1989030

Text

QFFtCfAL COPY

FEB

0 7

lSSO

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power and Light Company

ATTN:

Nr. J.

H. Goldberg

Executive Vice President - Nuclear

P.

O.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-335/89-30

AND 50-389/89-30

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

S.

A.

Elrod

and

N.

A. Scott

on

December

12,

1989

January

8,

1990.

The

inspection

included

a

review of activities

authorized

for your St.

Lucie

facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice",

Part

2,

Title

10,

Code

of

Federal

Regulations,

a

copy

of this letter

and its

enclosure(s) will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed 'by

Richard'V. Crlenjak (for)

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

Marvin V. Sinkule, Chief

Reactor Projects

Branch

3

Division of Reactor Projects

90022+

0%000335

900207

PDR ADOCDC

G

7 0/

Florida Power

and Light Company

FEB

0 7

1990

cc w/encl:

D. A. Sager,

Vice President

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

33454

G. J. Boissy,

Plant

Manager

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

33454

J.

B. Harper

Site

gA Superintendent

St.

Lucie Nuclear Plant

P.

0.

Box 128

Ft. Pierce,

FL

33454

Harold

F. Reis,

Esq.

Newman

& Holtzinger

1615

L Street,

NW

Washington,

D.

C.

20036

John

T. Butler,

Esq.

Steel,

Hector and Davis

400 Southeast

Financial

Center

Miami,

FL

33131-2398

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Jack

Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

cc w/encl:

(Cont'd page

3)

Florida Power

and Light Company

FEB

0 7

$990

cc w/encl cont'd:

State

Planning

and Development

Clearinghouse

Office of Planning

and Budget

Executive Office of the Governor

The Capitol Buildling

Tallahassee,

FL

32301

Weldon

B. Lewis

County Administrator

St.

Lucie C'ounty

2300 Virginia Avenue,

Room

104

Fort Pierce,

FL

33450

Charles

B. Brinkman

Washington

Nuclear Operations

Combustion

Engineering,

Inc.

12300 Twinbrook Parkway,

Suite

330

Rockvi lie,

MD

20852

State of Florida

bcc w/encl:

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

7585 South Highway AlA

Jensen

Beach,

FL

33457

  • Concurrences

RII: DBP

PMadden

02/3 /90

RII:

RC

jak

02///90