FR.IC3R.I EY ACCELERATED RIDS PROCESSING REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET g
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas
& Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFXLIATION
SUBJECT:
Monthly opera t for Nov 1995 for RE Ginna Nuclear Power Plant 51207 DISTRIBUTION CODE:
IE24D COPIES RECEXVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
P, R'
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 05000244 R
,'E ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1'
1 1
RECIPIENT ID CODE/NAME J
ON,A
- E CEN-RGN1 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 T
Y,'
C N
YO'I'E TO ALL"RIDS" RECIPIEY'TS:
PLEASE HELP US TO RF DUCE 'O'KSTE! COYTACT'I'IIE DOCL'WIEYTCOYTROL DESK. ROOK! Pl-37 (EXT. 504-~083 ) TO I LINIIYATEYOUR YAi!LFROil DISTRIBUTION LISTS I'OR DOCI.'h !EX'I'S YOL'O.'4"I'l,"ID!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
zzmgz 'tzzz
~ I ~ Ow Iha u
II'ZZZZZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14849-appal TCLEPHONE ARL'A coDE Tlat 546.2700 GINNA STATION December 7,
1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for November, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1995.
Very truly yours, Joseph A. Widay Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
L400gy 9512140172 951130 PDR ADOCK 05000244
. R PDR
OPERATING DATAREPl%T COMPLETED BY 50-244 December 7 1995 John V. Walden TELEPHONE (716) 7714588 Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
November 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
470 8.
IfChanges Occur In Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrictions, IfAn.
This Month Yr.-to-Date Cumulative
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
720.0 720.0 0.0 720.0 0.0 1057617.0 360429.0 342871.0 100.0 100.0 101.3 101.3 0.0 8016.0 7107.3 0.0 7032.4 0.0 10252215.0 3455281.0 3283693.0 87.7 87.7 87.2 87.2 0.6 228024.0 182923.1 1687.6
'80004.7 8.5
'55767452.0 84689333.0 80392923.0 78.9 78.9 76.1 76.1 5.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Start 4/01/96 Duration 60 da
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
AVERAGE DAILY VNIT POWER LEVEL IV DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE.
ecember 7
1995 COMPLETED BY:
John Walden TELEPHONE:
7 771-3588 MONTH November 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.
476 2.
18.
476 3.
475 19.
475 475 20.
474 5.
475 21.
474 6.
22.
476 23.
476 24.
476 9.
476 25.
477 10.
476 26.
477 476 27.
477 12.
476 28.
476 13.
476 29.
476 14.
476 30.
476 15.
476 31.
16.
476 INSTRVCTIONS On this format, list the average daily unit, power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DOCKI:T NO.
UNITNAhll'. R E. CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS
(.OhIPLl.,l I.D BY ohn V. Maiden No.
Date 0
e 0
~
0 c4 C0 00 IZ Pl 0
E v 0
0 N 0 0
CI Licensee Event Report 5
Ew e
0 0
EA C
Cl Ml 000 E
0 lJ Cause g Corrective Action to Prevent Recurrence F: Forced S:
Scheduled REV. 4/85 4949 Reason:
'-Equipmcnt Failure (Explain)
I3-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hlcthod:
I-hlanua I 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-OI6I)
Exhibit I - Same Source
IGQGGKTIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:
D COMPLETED BY:
ember 7
1995 John Walden TELEPHONE:
716 771-3588 MONTH November 1995 Average power for the month was 97%
~ f.
+4