NUREG-0841, Responds to Constituent K Karan Ltr Re Decommissioning Costs & Evacuation Plan for Plant That Would Be Implemented in Event of Accident.More Detailed Info on Decommissioning May Be Found in 1979 Environ Rept & NUREG-0841

From kanterella
Revision as of 02:39, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to Constituent K Karan Ltr Re Decommissioning Costs & Evacuation Plan for Plant That Would Be Implemented in Event of Accident.More Detailed Info on Decommissioning May Be Found in 1979 Environ Rept & NUREG-0841
ML17304B251
Person / Time
Site: Palo Verde  
Issue date: 06/13/1989
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Kyl J
HOUSE OF REP.
Shared Package
ML17304B252 List:
References
RTR-NUREG-0841, RTR-NUREG-841 NUDOCS 8906200055
Download: ML17304B251 (8)


Text

gy,fl REiIII

~

~

0O

++*++

~ ~~Icosi I-iI<

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

.June 13,.1989 The Honorable Jon Kyl United States House of Representatives Washington, D.C.

20515 Dear Congressman Kyl:

This letter responds to the recent correspondence that you forwarded to us from constituent Ms. Karen Karan of Mesa, Arizona.

Ms. Karan expressed interest in the decommissioning costs associated with the Palo Verde Nuclear Generating Station and in the existence of a current evacuation plan that w'ovid be implemented at Palo Verde in the event of an accident.

With respect to decommissioning considerations, the cost of decommissioning each of the three Palo Verde units was considered by Arizona Public Service Company (APS) during the licensing phase of the facility and was estimated to be

$ 65 mi llion in 1980 dollars.

More detailed information regarding decom-missioning may be found in the Palo Verde Environmental Report issued by APS in 1979 and in the Final Environmental Statement related to the operation of Palo Verde (NUREG-0841) issued by the United States Nuclear Regulatory Commission (NRC) in February 1982.

On June 27,

1988, the NRC amended its regulations to set forth technical and financial criteria regarding the decommissioning of nuclear facilities.

One intent of the amendments is to assure that adequate licensee funds for the decommissioning of licensed nuclear facilities such as Palo Verde will be available.

The amended regulations include stipulations of the minimum funding amount

($ 105 mi llion per unit in 1986 dollars) and the means by which financial ass!Irance is to be provided.

Consistent yIith our=-regulations, APS ',s requ-,r d

to submit to the NRC by July 26,

1990, information which describes how reasonable assurance will be provided that funds will be available to decommission Palo Verde.

With respect to evacuation

plans, Arizona Nuclear Power Project, the operator of Palo Verde, has prepared a comprehensive Emergency Plan that is in conform-ance with the requirements of our regulations (Title 10 of the Code of Federal Regulations, Part 50, Appendix E).

This Emergency Plan is periodically revised so that it remains current.

Section 6.6 of the Emergency Plan addresses the Evacuation Plan to be implemented in the event of an accident at Palo Verde and by reference, defines an emergency planning zone with a radius of 10 miles from the Palo Verde site.

Evacuation of individuals located more than 10 miles 8906200055 8906i3 PDR ADOCK 05000528 H

PDC 0 t-Ii) l/

l

The Honorable Jon Kyl from the plant site, such as those who live in the metropolitan Phoenix area (approximately 45 miles from Palo Verde), is not anticipated since the effects at that distance of a radioactive plume r'esulting from a maximum credible accident at Palo Verde, are expected to be insignificant.

However, the Emergency Plan does not preclude State and,county emergency organizations from exercising their authority and responsibility of ordering protective actions for the general public, should they deem them necessary.

2 Should Ms. Karan wish to review the above-mentioned documents for additional information, they may be found at the NRC's Local Public Document Room located at the Phoenix Public Library, Business and Science Division, 12 East McDowell

Road, Phoenix, AZ 85004.

I hope that this information will be helpful to Ms. Karan.

S incerely, GrigihalK~~

yg~op Steilo, J<

Victor Stello, Jr.

Executive Director for Operations DISTRIBUTION t~(50-520, 50-520 0 50=53037 (Local PDR w/cy of incoming/

EDO Reading J. Partlow D. Mossburg, PMAS (EDOA'4516) w/cy of incoming M. Virgilio GPA/CA V. Stello M. Krebs J.

Lee J. Martin, Region V

D. Crutchfield

~NRC PDR w/cy of incoming j EDDY'4516 T. Murley/J. Sniezek PD5 Reading w/cy of incoming G. Holahan OGC SECY G. Knighton T. Chan w/cy of incoming PD5 Green Ticket File F. Miraglia F.

Gi llespie

  • See previous

[GREEN TICKET D

/PD5 6/

89 (A

BP G

an 6

g/89'oncurrence 4516]

DRSP PD5 TCh n:dr 6/

89 P:

6/

/8 (A)AD'DRSP35 MVirgilio 89

'7 /89 OGC ED VS 1 lo 89 6/

/89 6//g g g< 6/

TECH EDITOR*

DR D5 MMejac G

on 6/6/89 6/

/89 DON)I 6/

9

I 3

'1

$ K Ih 4'

l 4

KK h

3 3

Fj ja I

(

3

~'

4 3

3 I

I 4 a')h

".IK)'hj I a<j h

4 4

3 3

V 4

3 4

j,t I

))

h'

( 3 3

I(>)

I ir

~

~. 'p,N Rfgy Vp O~

r 0

~**+~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

=DO Princioal Correspondence Contro FROM:

REP.

DON KYL DUE: 06/09/89 EDO CONTROL: 00045l6 DOC DT: 05/22/8'V FINAL REPLY:

TO:

OCA FOR SIGNATURE OF:

CRC NO: 89-0508 EXECUTIVE DIRECTOR DESC:

ENCLOSES LTR FROM KAREN KARAN CONCERNING PALO VERDE ROUT lNG:

MARTIN. RV DATE: 05/26/89 ASSIGNED TO:

NRR CONTACT:

MURLEY SPECIAL INSTRLICTIONS OR REMARKS:

RETURN INCOMING ldITH RESPONSE NRR RECEIVED:

tRY 26, 1989 ACTION:

t;DRSP: HOLAHANQ NRR ROUTING:,

tlURLEY/SNIEZEK NIRAGLIA PARTLOM CRUTCHF IELD GILLESPIE t10SSBURG ACTION D;

.. "E to @

DIRECTORS OFFICE.

...:8V

l'f k

4 $

I

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:

ACTION OFFICE:

AUTHOR:

AFFILIATION:

LETTER DATE:

SUBJECT:

ACTION:

DISTRIBUTION:

CRC-89-0508 EDO LOGGING DATE: May 25 89 J.

Kyl Const Ref U.S.

HOUSE OF REPRESENTATIVES May 22 89 FILE CODE:

ID&R-5 Palo Verde Questions concerning Palo Verde etc; Direct Reply OCA to Ack SPECIAL HANDLING: None NOTES DATE DUE:

SIGNATURE:

AFFILIATION:

Karen Karan Jun 10 89 DATE SIGNED:

AiAOff. EDO e~e yg0-0005.1 6

0 H

d p