SBK-L-17164, Spent Fuel Pool Integrity Evaluation Summary Supplemental Report in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the .

From kanterella
Revision as of 01:26, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Spent Fuel Pool Integrity Evaluation Summary Supplemental Report in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the .
ML17307A016
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/02/2017
From: Mccartney E
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-17164
Download: ML17307A016 (8)


Text

November 2, 2017 SBK-L-17164 Docket No. 50-443 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station NEXTera ENERGY ~

SEABROOK Spent Fuel Pool Integrity Evaluation Summary Supplemental Report in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review oflnsights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review oflnsights from the Fukushima Dai-Ichi Accident," March 12, 2012, ADAMS Accession Number ML12053A340
2. EPRI 3002009564, Seismic Evaluation Guidance: Spent Fuel Pool Integrity Evaluation, January 2017
3. NRC Letter, "Endorsement of Electric Power Research Institute Report 3002009564,

'Seismic Evaluation Guidance: Spent Fuel Pool Integrity Evaluation,'" February 28, 2017, ADAMS Accession Number ML11034A408

4. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," October 27, 2015, ADAMS Accession Number ML15194A015
5. NextEra Energy Seabrook, LLC letter SBK-14052 to the NRC, "NextEra Energy Seabrook, LLC Seismic Hazard and Screening Report (CEUS Sites) Response to NRC request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-term Task Force Review oflnsights From the Fukushima Dai-ichi Accident," March 27, 2014, ADAMS Accession Number ML14092A413
6. Seabrook Station, Unit 1 - Staff assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations, Part 50, Section50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-term Task Force Review of Insights From the Fukushima Dai-ichi Accident," August 12, 2015, ADAMS Accession Number ML15208A049 NextEra Energy Seabrook, LLC PO Box 300, Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-17164/Page 2 The NRC issued a 50.54(+/-) letter on March 12, 2012 (Ref. 1), requesting information to assure that recommendations from the Fukushima Near-Term Task Force (NTTF) are addressed by all U.S. nuclear power plants. The 50.54(+/-) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(+/-) letter was a request that licensees perform a SFP Evaluation.

Subsequent guidance for performing SFP Integrity Evaluations was provided by EPRI in Technical Report 3002009564 (Ref. 2), which provides criteria for evaluating the seismic adequacy of a SFP to the reevaluated ground motion response spectrum (GMRS) hazard levels.

EPRI 3002009564 was endorsed by the NRC in Reference 3.

Final screening identifying plants needing to perform a limited scope SFP Integrity Evaluation, including Seabrook Station, was provided by the NRC in Reference 4. Plants were divided into two categories with regard to SFP evaluations, those with GMRS peak spectral accelerations less than 0.8g, and those with higher peak spectral accelerations.

Seabrook Station specific GMRS values were submitted to the NRC in Reference 5, and accepted by the NRC in Reference 6. Seabrook Station's GMRS peak spectral acceleration is greater than 0.8g. Section 4 of EPRI 3002009564 (Ref. 2) is therefore applicable to Seabrook.

Section 4.3 of EPRI 3002009564 lists the parameters to be verified to confirm that the results of the report are applicable to NextEra Energy Seabrook, and that the Seabrook Station SFP is seismically adequate in accordance with NTTF 2.1 Seismic evaluation criteria.

The enclosure to this letter provides the SFP Integrity Evaluation Summary for Seabrook Station prepared in accordance with EPRI 3002009564 and confirms that the SFP is seismically adequate in accordance with NTTF 2.1 Seismic evaluation criteria.

This letter contains no new regulatory commitments.

Should you have any questions concerning this submittal, please contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932.

I declare under penalty of pe1jury that the foregoing is true and correct.

Executed on November 1-M, 2017.

Sincerely, N extEra Energy Seabrook, LLC

~bl~~

Regional Vice President --~orthern Region

U.S. Nuclear Regulatory Commission SBK-L-17164/Page 3 Enclosure cc:

D. Dorman, NRC Region I Administrator J. Poole, NRC Project Manager, Project Directorate 1-2 P. Cataldo, NRC Senior Resident Inspector Director, Office of Nuclear Reactor Regulation Mr. Eric E. Bowman, NRR/JLD/PPSD/HMB Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Depaiiment of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399

Enclosure to Letter SBl<-L-17164 Seabrook Station NextEra Energy Seabrook, LLC Docket No. 50-443 Spent Fuel Pool Integrity Evaluation Summary

Enclosure to Letter SBK-L-17164 SEABROOK STATION SPENT FUEL POOL INTEGRITY EVALUATION

SUMMARY

The NRC issued a 50.54(f) letter on March 12, 2012 (Ref. 1 ), requesting information to assure that recommendations from the Fukushima Near-Term Task Force (NTTF) are addressed by all U.S. nuclear power plants. The 50.54(f) letter requested that, in conjunction with the response to NTTF Recommendation 2.1, a seismic evaluation be made of the SFP. More specifically, plants were asked to consider "all seismically induced failures that can lead to draining of the SFP." Such an evaluation would be needed for any plant in which the ground motion response spectrum (GMRS) exceeds the safe shutdown earthquake (SSE) in the 1 to 10 Hz frequency range. The NRC staff confirmed through References 3 and 4 that the GMRS exceeds the SSE and concluded that a SFP evaluation is merited for Seabrook Station. By letter dated 02/08/2017 (Ref. 5), the NRC staff determined that EPRI 3002009564 (Ref. 6) was an acceptable approach for performing SFP evaluations considering the GMRS hazard levels.

The table below lists the criteria from Section 4.3 of EPRI 3002009564 along with data for Seabrook Station that confirms applicability of the EPRI 3002009564 criteria and confirms that the SFP is seismically adequate in accordance with NTTF 2.1 Seismic evaluation criteria. A site-specific boil off and evaporation calculation was performed in Reference 8 to validate that the EPRI 3002009564 acceptance criteria are met for the two parameters listed below not bounded by EPRI 3002009564 Section 4.3 criteria values.

SFP Criteria from EPRI 3002009564 Site-Specific Data Site Parameters

1. The site-specific GMRS should be the The Seabrook Station GMR~ peak spectral same as that submitted to the NRC acceleration in Reference 2 as accepted by the between March 2014 and July 2015, NRC in Reference 3 is 1.060g. This same which the NRC has found acceptable for GMRS is used for the Seabrook SFP Structural responding to the NRC 50.54(f) letter.

Integrity evaluations.

Structural Parameters

2. Site-specific calculations, performed in Site-specific calculations (Ref. 7), performed in accordance with Section 4.1 of EPRI accordance with Section 4.1 of EPRI 3002009564 should demonstrate that the 3002009564, demonstrate that the limiting SFP limiting SFP HCLPF is greater than the HCLPF is 1.423g, which exceeds the GMRS site-specific GMRS in the frequency peak ground acceleration of 0.499g. Therefore, range of interest (e.g., 10-20 Hz).

this criterion is met for Seabrook Station.

3. The SFP structure should be included in The SFP structure is included in the Seabrook the Civil Inspection Program performed in Station Civil Inspection Program (Ref. 9) in accordance with Maintenance Rule.

accordance with 10 CFR 50.65, therefore, this criterion is met for Seabrook Station.

Page 1 of 4

Enclosure to Letter SBK-L-17164 Seabrook Station Spent Fuel Poo) Integrity Evaluation Summary SFP Criteria from EPRI 3002009564 Site-Specific Data Non-Structural Parameters

4. To confirm applicability of the piping The maximum depth of piping below the water evaluation in Section 4.2 of EPRI surface is not less than six feet. The limiting 3002009564, piping attached to the SFP penetration is the 1 O" SFP cooling return line should have penetrations no more than with a penetration bottom elevation 9.45 ft.

six feet below the water surface.

below the SFP normal water surface elevation (Ref. 8). Therefore, this criterion is not met for Seabrook Station.

A detailed calculation of the boil-off and evaporation rate considering a penetration break and siphoning is provided in Reference 8. It was concluded that that the limiting penetration break and/or siphoning event combined with boil-off and evaporation are not sufficient to uncover 1/3 of the fuel assemblies' height in less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (Ref. 8). Time to reach the top of the spent fuel storage racks is calculated in Reference 8 to be 89 hours0.00103 days <br />0.0247 hours <br />1.471561e-4 weeks <br />3.38645e-5 months <br />. Therefore the Seabrook Station SFP penetration heights meet the EPRI 3002009564 acceptance criteria for potential inventory loss due to a seismic event.

5. To confirm ductile behavior under The SFP gate is constructed from a stainless increased seismic demands, SFP gates steel alloy as documented Reference 10, should be constructed from either therefore, this criterion is met for Seabrook aluminum or stainless steel alloys.

Station.

Page 2 of 4

Enclosure to Letter SBK-L-17164 Seabrook Station Spent Fuel Pool Integrity Evaluation Summary SFP Criteria from EPRI 3002009564 Site-Specific Data Non-Structural Parameters (cont.)

6. Anti-siphoning devices should be Each piping line that could potentially lead to installed on any piping that could lead to siphoning water from the SFP has an anti-siphoning water from the SFP. In siphoning mechanism (Ref. 8). Therefore, this addition, for any cases where active anti-criterion is technically met. However the siphoning devices are attached to 2-inch Seabrook Station piping configuration would or smaller piping and have extremely result in a siphoning inventory loss greater than large extended operators, the valves the one assumed in criterion #4 above. Upon should be walked down to confirm review of the existing piping configuration and adequate lateral support.

the locations of the siphon breakers, the 4" SFP purification return line would cause the largest water loss due to siphoning in case of a line break (Ref. 8). The line has a 1/2" siphon hole in the SFP at elevation 13' O" (Ref. 11 ). This criterion will therefore be treated as not met.

A detailed calculation of the boil-off and evaporation rate considering a line break of the 4" SFP purification return line and siphoning of SFP inventory to elevation 13' O" is provided in Reference 8. It was concluded that that the limiting siphoning event combined with boil-off and evaporation are not sufficient to uncover 1 /3 of the fuel assemblies' height in less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (Ref. 8). Time to reach the top of the spent fuel storage racks is calculated in Reference 8 to be 89 hours0.00103 days <br />0.0247 hours <br />1.471561e-4 weeks <br />3.38645e-5 months <br />. Time required to boil off SFP inventory from the top of the spent fuel storage racks to uncover 1 /3 of the fuel assemblies' height provides additional margin.

Therefore the arrangement of Seabrook Station SFP anti-siphon devices meets the EPRI 3002009564 acceptance criteria for potential inventory loss due to a seismic event.

7. To confirm applicability of the sloshing The Seabrook Station SFP has a length of evaluation in Section 4.2 of EPRI 37.5 ft., a width of 27.0 ft., and a depth of 3002009564, the maximum SFP 39.46 ft. based on Reference 12. Therefore, this horizontal dimension (length or width) criterion is met for Seabrook Station.

should be less than 125 ft. and the SFP depth should be greater than 36 ft.

8. To confirm applicability of the evaporation The Seabrook Station SFP has a surface area of loss evaluation in Section 4.2 of EPRI 1012.5 ft. 2 (27.0' x 37.5' per Ref. 11), which is 3002009564, the SFP surface area greater than 500 ft. 2. Licensed reactor thermal should be greater than 500 ft2 and the power for Seabrook Station is 3648 MWt per unit licensed reactor core thermal power (Reference 13, Section 1.1.1), which is less than should be less than 4,000 MWt per unit.

4,000 MWt. Therefore this criterion is met for Seabrook Station.

Page 3 of 4

Enclosure to Letter SBK-L-17164 Seabrook Station Spent Fuel Pool Integrity Evaluation Summary

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident," March 12, 2012, ADAMS Accession Number ML12053A340
2. Seabrook Letter, SBK-L-14052, "NextEra Energy Seabrook, LLC Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident", March 27, 2014, ADAMS Accession Number ML14092A413
3. NRC Letter, "Seabrook Station, Unit 1 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident", August 12, 2015, ADAMS Accession Number ML15208A049
4. NRC Letter, "Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident." October 27, 2015, ADAMS Accession Number ML15194A015

5. NRC Letter, "Endorsement Of Electric Power Research Institute Report 3002009564,

'Seismic Evaluation Guidance: Spent Fuel Pool Integrity Evaluation,"' February 28, 2017, ADAMS Accession Number ML17034A408

6. EPRI Technical Report 3002009564, Seismic Evaluation Guidance: Spent Fuel Pool Integrity Evaluation, January 2017
7. FP101180, Rev. 0, Jensen Hughes S&A Calculation 1TCR27128-SQ-CAL-001, "Spent Fuel Pool Structural Evaluations," Rev. 0
8. FP101184, Rev. 0, Jensen Hughes S&A Report 1 TCR27128-SQ-RPT-001, "Spent Fuel Pool Evaluation Supplemental Report Submittal," Rev. 0
9. Seabrook Structures Monitoring Program Manual (SMPM), Rev. 2
10. Seabrook Drawing 102217, Fuel Storage Building Stainless Steel Spent Fuel Pool Liner -

Sheet 5, Revision 4 11. Seabrook Isometric Drawing SF-1709-03, Spent Fuel Pool Cooling Line 1-SF-1709-02, Revision 5

12. Seabrook Drawing 102200, Fuel Storage Building Stainless Steel Spent Fuel Pool Liner -

Sheet 1, Revision 12