ML17312A642
| ML17312A642 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/29/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312A643 | List: |
| References | |
| EA-96-103, NUDOCS 9604040230 | |
| Download: ML17312A642 (8) | |
See also: IR 05000528/1996002
Text
Cq
y,8 llECp
0
Cy
w1
4t
0
C
O
0*4
EA 96-103
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R EG ION IV
611 RYAN PLAZA ORIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
gg 29 l996
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/96-02;
50-5"3/96-02;
50-530/96-02
This refers to the inspection
conducted
by Mr. J.
Kramer and other inspectors
of this office on January
28 through
March 9,
1996, at the Palo Verde Nuclear
Generating
Station,
Units 1,
2,
and 3, facility.
The purpose of the
inspection
was to determine
whether activities authorized
by the license
were
conducted
safely
and in accordance
with NRC requirements.
At the conclusion
of the inspection,
the findings were discussed
with those
members of your
staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection
are documented
on
page
1, in the enclosed
report.
Section
9,3 of the enclosed
report identifies
a noncited violation of
10 CFR 50, Appendix B, Criterion III, "Design Control," for failure to
identify and test
backup containment
protection devices.
This
violation, which normally would have
met the criteria for a Severity
Level
IV
violation, is not being cited in accordance
with Section VII.B.3 of the
NRC
Enforcement
Manual.
The violation was not cited because it involved old
design
issues,
was identified by a voluntary licensee initiative, was
. adequately
corrected,
and
was considered
unlikely that routine licensee
activities would have identified the problem.
We commend your initiative to
- reexamine your design
and encourage
your continued voluntary review of old
design
documents.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you .have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sin
r ly,
.
E.
D
r, Director
Divisi n of Reactor Projects
9604040230
960329
ADQCK 05000528
8
~f
[,
Il f
I
Arizona Public Service
Company
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Enclosure:
NRC Inspection
Report
50-528/96-02;
50-529/96-02;
50-530/96-02
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Hr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
P.O.
Box 800
Rosemead,
91770
Arizona Radiation Regulatory Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Naricopa
County Hoard of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Hanager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
I
I
I
Arizona Public Service
Company
-3-
MAR 29
l996
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
E-Mail report to M. Davis,
NRR (MJD1)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
DRS-PSB
MIS System
RIV File
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:~t PViPV602RPT.DFK
To receive copy of document, indicate in box "C" ~ Copy without enclosures
E" ~ Copy with enclosures "tt" ~ No copy
RI:PV
.
E
C:DRP/F
E
E
E
D:DRP
N
JGKramer
03/21/96
DFKirs
03/21/96
FSa
rn
03
/9
OF IC
R
CO
JEDye
03/
96
'
,I
l,
Arizona Public Service
Company
NR 29 l996
E-Hail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
( IPAS)
E-Hail report to H. Davis,
NRR (MJDl)
(bc'c 'o DMB '( IEOl )
bcc distrib.
by RIV:
L. J.
Callan
DRP Director
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
Resident
Inspector
DRS-PSB
HIS System
RIV Fil e
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:i PV'ItPV602RPT.DFK
To receive copy ol document, indicate in bore "C" ~ Copy without enclosures
"E" I Copy with enclosures
"N" ~ No copy
RI: PV
E
C:DRP/F.
E
E
JGKramer
DFKirs
FSa
rn
03/21/96
03/21/96
03
/9
0
C
RCO
E
D:DRP
N
JEDye
03/
96