CATEGORY 2
E
05000528
05000529~
05000530 0
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
t
ACCESSION NBR:9607090059
DOC.DATE: 96/07/05
NOTARIZED: NO
DOCKET
FACIL:STN-50-528 Palo Verde Nuclear Station,
Unit 1, Arizona 'Publi
05000528
STN-50-529 Palo Verde Nuclear Station,
Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
,
AUTHOR AFFILIATION
CALLAN,L.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
STEWART,W.L.
Arizona Public Service
Co.
(formerly Arizona Nuclear
Power
C
SUBJECT:
Forwards
SALP repts 50-528/96-99,50-529/96-99
a 50-530/96-99
for period covering 941201-960601.
A
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED:LTR l
ENCI $
SIZE:
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
RECIPIENT
ID CODE/NAME
PD4-2
LA
CLIFFORD,J
COPIES
LTTR ENCL
1
1
1
1
RECIPIENT
ID CODE/NAME
PD4-2
CLIFFORD,J.
COPIES
LTTR ENCL
1
1
1
1
INTERNAL: ACRS
e
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HOLB
OE DIR
RGN4
FILE
01
2
2
1
1
1
1
1
1
1
1
1
1'XTERNAL:
L ST LOBBY WARD
1
NOAC
1
MMI
NRR/DRCH/HHFB
NUDOCS-ABSTRACT
OGC/HDS2
LITCO BRYCE,J
H
NRC PDR
I
5
5
1
1
1
1
1
1
1
- 1
D
0
1
1
1
1
C
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP
US
TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
I
1g<<((K('(((1p
,Wl
r
rp <<<<*<<"
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011.6064
July 5.
1996
William L. Stewart.
Executive Vice
President.
Nuclear
Arizona Public Service
Company
P.O.
Box 53999
Phoenix.
85072-3999
SUBJECT:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE (SALP)
REPORT 50-528/96-99:
50-529/96-99:
50-530/96-99
'Oear
Mr. Stewart:
Enclosed for your review is the
SALP report for the Palo Verde Nuclear
Generating Station. for the period December
1,
1994,
through June
1,
1996.
A
public meeting to discuss this report with you and your staff has
been
scheduled for 9 a.m.
(MST) on July 24,
1996. at the Energy Information Center
at the Palo Verde site.
Ouring this meeting you are encouraged
and expected
to candidly comment
on our report.
Although this meeting is
a forum between
Arizona Public Service
Company
and the
NRC, it will be open to observation
by
members of the public and other interested parties.
In accordance
with NRC policy, I have reviewed the recommendations
of the
Board and concur with their ratings
and views.
The operations,
maintenance,
and engineering
functional areas
have
been rated
as Category
1, reflecting
superior safety performance.
The plant support functional area
has
been rated
as Category 2, reflecting overall
good safety performance.
,: .IJI@~ signi ficant. improvemqpt reflect@, in three -functional pleas
>is
. rg,
I
'" commendable.
It is cle'ar that Aiizonf Public Seivice'has
established
the
programs
and processes
necessary
to achieve
and sustain
superior
performance.
Management attention is evident at All levels:
self-assessments
have
been
fully assimilated
throughout the Palo Verde organization:
and. self-criticism
has
been institutionalized
as
a path for individual and organizational
improvement.
However, additional challenges
remain to maintain
a consistent
and sustained
level of performance.
especially in the area of individual
attention-to-detail.
In the operations
area.
overall performance
improved sufficiently to achieve
a
Category
1 rating;
however.
the
SALP Board was not unanimous in reaching this
decision.
The considerable
actions
undertaken to improve operational
performance
and provide the operations
organization
leadership
necessary
to
achieve superior performance
throughout the site were recognized.
However,
improvements in procedure
use
and adherence.
and operator attention to details
are necessary
to address
inconsistencies
observed
in individual performance
and assure
continued superior performance.
9607090059
960705
ADOCK 05000528
8
Arizona Public Service
Company
-2-
In the maintenance
area.
safety performance
was also recognized
as having
improved to the superior levels
as demonstrated
by the improved material
condition of the primary plant and the low number of maintenance-induced
plant
challenges.
Management attention
and the skills displayed
by craft personnel
were significant contributors to the improvement in this area.
During the assessment
period.
the engineering
area
demonstrated
superior
safety performance.
The high quality of engineering
work products
was clearly
evident in the support provided in resolving problems with the site's
round
cell batteries
and the Unit 2 stuck fuel assembly.
Numerous engineering
programs'uch
as the steam generator
tube degradation
and thermography
programs,
were indicative of the superior contributions to safe plant
operations.
The plant support area continued to perform at
a good safety level.
The
emergency
preparedness
were seen
as areas of
strength:
however,
inconsistencies
in the implementation of the radiation
protection
and security programs
presented
continuing challenges
and detracted
from the overall functional
area rating.
Continual deficiencies
were
identified with the surveying
and posting of radiation and contamination
areas,
and ongoing difficulties were noted in the administration of the access
authorization
program.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
t;his letter and its enclosures will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning the
SALP report,
I will be pleased to
discuss
them with you.
While no written response
is required to the SALP
report. if you wish, you may provide written comments within 30 days of the
-'. public SALP, meeting.
Sincerely,
Docket Nos.:
50-528
50-529
50-530
License Nos.:
NPF-51
Enclosure:
NRC SALP Report 50-528/96-99:
50-529/96-99:
50-530/96-99
L.
Callan
Regional Administrator
g
ilj
Arizona Public Service
Company
cc w/enclosure:
Mr. Steve
Olea
Arizona Corporation
Commission
1200
W. Washington Street
Phoenix,
85007
Douglas
K. Porter.
Senior
Counsel
Southern California Edison
Company
Law Department.
Generation
Resources
P.O.
Box 800
Rosemead.
91770
Aubrey V. Godwin. Director
Arizona Radiation Regulatory Agency
4814 South
40 Street
Phoenix.
85040
Chairman
Maricopa County Board of Supervisors
111 South Third Avenue
Phoenix,
85003
Angela
K. Krainik. Manager
Nuclear Licensing
Arizona Public Service
Company
P.O.
Box 52034
Phoenix,
85072-2034
0
Arizona Public Service
Company
-4-
E-Hail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB ( IE40)
bcc distrib.
by RIV:
L. J. Callan
Resident
Inspector
ORP Director
ORS-PSB
Branch Chief (ORP/F,
WCFO)
MIS System
Senior Project Inspector
(DRP/F
~
WCFO)
RIV File
Branch Chief (DRP/TSS)
M.
Hammond
(PAO
~
WCFO)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
Records
Center.
Chairman Jackson
(HS: 16-G-15)
S. J. Collins'RA
Commissioner
Rogers
(MS: 16-G-15)
. B. Henderson,
PAO
Commissioner
Dicus
(MS: 16-G-15)
J.
M. Taylor'OO
(HS:
17-G-21)
SRIs at all RIV sites
Associate Dir. for Projects'RR
D.
D. Chamberlain,
DD:DNHS
Associate Dir. for Insp.,
and Tech.
Assmt,
C.
A. Hackney
SALP Program Hanager,
NRR/ILPB (2 copies)
Carol Gordon
W.
H. Bateman,
NRR Project Director
(MS:
13-E-16)
J.
W. Clifford, NRR Project
Manager
(HS:
13-E-16)
C.
R.
Thomas,
NRR Project Manager
(HS:
13-E-16)
j
~'
DOCUMENT NAME:
R:~
PV'~PV6-99SF.KEB
To receive copy of document, mdicete in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RIV:DD: DRS
KEBrockman
07/ 2296
RI
- W
KEPerkin
07/ W96
RI
A
WHBateman
07/M96
J o lin
LJCallan
07
6
07/M/96
NRR: D: PDIV-2 'IV.
~
A
Publ i c Servi ce Company
-4-
E-Mail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
( IPAS)
bcc to
DMB ( IE40)
bcc distrib.
by RIV:
L. J. Callan
Resident
Inspector
DRP Director
DRS-PSB
Branch Chief (DRP/F.
WCFO)
HIS System
Senior Project
Inspector
(DRP/F,
WCFO)
RIV File
Branch Chief (DRP/TSS)
H.
Hammond
(PAO.
WCFO)
Leah Tremper
(OC/LFDCB.
HS:
TWFN 9E10)
Records
Center.
Chairman Jackson
(HS: 16-G-15)
S. J. Collins.
Commissioner
Rogers
(HS:
16-G-15)
B. Henderson,
PAO
Commissioner
Dicus
(HS:
16-G-15)
J.
H. Taylor.
(HS:
17-G-21)
SRIs at all RIV sites
Associate Dir. for Projects
~
D.
D. Chamberlain,
DD:DNHS
Associate Dir. for Insp.,
and Tech.
Assmt,
C. A. Hackney
SALP Program Manager.
NRR/ILPB (2 copies)
Carol
Gordon
W.
H. Bateman,
NRR Project Director (HS:
13-E-16)
J.
W. Clifford, NRR Project Manager
(HS:
13-E-16)
C.
R.
Thomas.
NRR Project
Manager
(MS:
13-E-16)
DOCUMENT NAME:
R:K PVYPV6-99SF.KEB
To receive copy of document, tndicete in box: "C" ~ Copy without enclosures
"E" ~ Copy with enciosures
N" a No copy
RIV:DD: DRS
KEBrockman
07/ M96
RI::W
C
KEPerkin
.07/ M96
NRR:D:PDIV-2
C
WHBateman
07/M96
R
Y
RIV;DR-
A
RI
A
SJQol1ins.-
LJCal lan
07/~/96
07/~/96
0