ML17325A113

From kanterella
Revision as of 15:55, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept:On 870505,Fire Door 325 Inoperable in Excess of 7 Days for Replacement.Fire Watch Established.Door Declared Operable on 870512
ML17325A113
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/19/1987
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8705290008
Download: ML17325A113 (3)


Text

REGULATORY Ii RM*TION DISTRIBUTION SYS 1 ~Pl (R IDS) j

)ACCESSION NBR: 8705290008 DOC. DATa: 87/05/19 NOTARIZED:

NO DOCKET FACIL: 50-315 Donald C.

~ Cook Nuclear Pover Plant>

Unit ii Indiana 5

05000315 50-316 Donald C.

Cook Nuc lear Pover Plant>

Unit 2.

Ind iana 0

05000316 AUTH. NAME AUTHOR AFFILI*TION SMITHS'.

Q.

Indiana 8c Michigan Electric Co.

RECIP. NAME RECIPIENT AFFILIATIO'3 DAVIS'*.B Region 3i Office of Director

SUBJECT:

Special rept: on 870505'ire door 325 inoperable in excess of 7 days for replacement. Fire l."tch established.

Door decl~red op crab le on 870512.

DISTRIBuTION CODE:

IE22D COPIES RECEIVED: LTR J ENCL g SIZE:

TITLE: 50. 73 Licensee Event Report (LEH)i Incident Rpti etc.

NOTES:

REC IPIENT ID CODE/NAME PD3-3 LA WIQQINQTON, D INTERNAL: ACRS MICHELSON AEOD/DOA

  • EOD/DSP/TPAB NRR/DEST/ADE NRR/DEST/CEB NRR/DEST/ ICSB NRR/DEST/MTB NRR/DEST/RSB NRR/DLPG/HFB NRR/DOEA/EAB NRR/DREP/RPB NRR/PMAS/PTSB RES DEPY QI EXTERN*L:

EQ8 J COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 1

2 2

1 1

1 5

5 1

1 1

RECIPIENT ID CODE/NAME PD3-3 PD ACRS MOELLER AEOD/DSP/ROAB DEnRO NRR/DEST/ADS I'RR/DEST/ELB KRR/DEST/MEQ NRR/DEST/PSB N~R/DEST/SQB NRR/DLPG/GAB NRR/DREP/RAB I

/ ILRB REG FILE 02 E

01 H ST LOBBY WARD NRC PDR KSIC MAYSi Q COP IEB LTTR ENCL 1

1 2

2 2

'2 1

1 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTlR 42 ENCL 40

~ meric:en j'Qlaatrlo INDIANA& NIICHIGANEIECTRIC CONIPANY Donald C. Cook Nuclear Plant P.O. Box 458. Bridgman, Michigan 49t06 May 19, 1987 Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 Operating License Nos.

DPR-58 and DPR-74 Document Control Desk United States Nuclear Regulatory Commission Region EZI Washington, D.C.

20555 ATTN:

Mr. A. Bert Davis This special report is being submitted pursuant to the requirements of Technical Specification 3.7.10 Action (a) to inform you that Fire Door 325 was inoperable in excess of 7 days.

Technical Specification 3.7.10 Action (a) requires that a fire door be returned to service within 7 days or a special report be submitted.

On May 5, 1987, at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, Fire Door 325 separating the Unit 1 Reactor Cable. Tunnel Quadrants 3M and 3S was declared inoperable to facilitate replacement of the fire door.

Due to difficulties encountered in replacement of the door, the door was not declared operable until May 12, 1987, at 1634 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.21737e-4 months <br />.

This exceeds the 7 day requirement by 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 34 minutes.

A fire watch, as required by Technical Specification 3.7.10 Action (a),

had been established and was in effect at all times.

Respectfully Yours, W.G. Smith, r.

Plant Manager cc:

See Attached Distribution DOQy, 05000315 ttr0008 870519 PDR A

PDR S

John E. Dolan A. B. Davis, Region III M. P. Alexich R.

F. Kroeger H. B. Brugger R.

W. Jurgensen NRC Resident Inspector R.

C. Callen G. Charnoff, Esq.

D.

Hahn INPO PNSRC A. A. Blind Dottie Sherman, ANI Library D. Wigginton, NRC File