05000251/LER-1980-003-03, While Testing 4C Steam Generator Feedwater Control Valve,Change in Steam Generator Level Lifted Low Setpoint Valve.Valve Did Not Fully Reseat. Caused by Binding Between Lifting Gear & Release Nut

From kanterella
Revision as of 13:54, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
While Testing 4C Steam Generator Feedwater Control Valve,Change in Steam Generator Level Lifted Low Setpoint Valve.Valve Did Not Fully Reseat. Caused by Binding Between Lifting Gear & Release Nut
ML17339B117
Person / Time
Site: Turkey Point 
Issue date: 05/30/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17339B116 List:
References
LER-80-003-03L-03, LER-80-3-3L-3, NUDOCS 8006190285
Download: ML17339B117 (2)


LER-1980-003, While Testing 4C Steam Generator Feedwater Control Valve,Change in Steam Generator Level Lifted Low Setpoint Valve.Valve Did Not Fully Reseat. Caused by Binding Between Lifting Gear & Release Nut
Event date:
Report date:
2511980003R03 - NRC Website

text

/

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) i ACCESSION NBR 8006190285 DOC ~ DATE! 80/05/30 NOTARIZED ~

NO DOCKET FACIL:50 251 Turkey Point Planti Unit 4r Florida Power and,L.ight C

05000251 AUTH INANE AUTHOR AFFILIATION'CHOPPMANrM

~ AD Florida Power 8 Light Co..

RKCIP ~ NAME RECIPIENT AFFILIATION I

Region 2i Atlantean Office of the Director

SUBJECT:

Updated LKR 80 003/03L Oton 800215iwhlle testing 4C steam generator feedwater control valverchange in steam generator level l,ifted low setpo.int valve. Valve did not" full.y reseat.

Caused by binding between lifting gear 8 release nuts

DISTRIBUTION COOK:

A002S COPIES RECEIVED:LTR

'NCL", Q SIZE:

Q-~

TITLE: Incident" Reports NOTES; RECIPIE~~

IO COOK/NAME ACTION:

BC': t/HRCRi,-S; 05 INTERNAL; A/D RAD PROT A/0 TECHNOLOGY AUX SYS BR CONT SYS BR EMERG PREP HANAUERgS ~

I&E 09 MPA li OP 'EX EVAL: BR Oi

~

SYS INTERAC BR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 2

2 3

3 3

3 1

1 1

1 1

1 RECIPIENT IO CODE/NAME A/D'EACT SYS

.AEOD CHEM ENG BR'ISENHUTgD ~

EQUIP QUAL; BR ISC. SYS BR JORDANi'E ~

/IE'RC PDR 02 OR ASSESS BR

QA BR SIT ANAL BR TERA:DOUG MAY COPIES

'LTTR ENCL 1

10 10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

EXTERNAL: ACRS NSIC 04 16 16 1

1 LPDR 03 1

1 JUN p p f980 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 60 ENCL 60

ib N

0