L-80-349, Forwards Results of Steam Generator Insps Conducted During Outage.Based on Insp Results,Tube Plugging Program & Previously Submitted Analyses,Return to Full Power for Six Months Does Not Involve Unreviewed Safety Questions
| ML17340A314 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/22/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17340A315 | List: |
| References | |
| L-80-349, NUDOCS 8010300446 | |
| Download: ML17340A314 (6) | |
Text
REGU ORY INFORMATION DISTRIBUTE
'lr SYSTEM (RIDS)
ACCESSION NBR:8010300006 DOC, ~ DATEt 80/10/22 N.TARIZED! YES DOCKET FACIL:50-250 Tur key Po~int Pil ant E
Uni t 3i F>>l orl de>> Power and Light C
05000250 AUTHRNAME' U T H 0 R AF F rI L>>I ATI0 N UHRIGE R ~ E ~
F>>lorida Power 8 L'ight" C'o ~.
RECIP' NAME RECAP'IENT>> AFFILIATION
'ISENHUT'i D ~ G ~
D.i vi s.i on oif Llicensing
SUBJECT:
For war ds r esul ts-o~f>> steam generator insps conducted during outag'e
~ Based on insp r'esultsitube plugg,ing program 8
previously submitted analysesireturn to, ful.l power for "six months does not>> invor'Ive unrev,iewed safety;. questions DISTRIBUTION CODE; AOOIS COPIES RECEIVED:LrTR g 'NCL'.QiP SIZE::, 3'~i.33 TITLE: Gener ail Distribution>> fora'fter Issuance of*'Operating L>>icense NOTES:
RECIPIENT'D CODE'/NAME'CTION:
V'ARGA E 8 ~.
04 I~TERNAL:: D/DIR,HUM FAC08 NRC'DR 02 OR ASSESS BR 10 COP>>IES LITTR ENCL 13 1'3 1.
1 1.
1 1.
0 REC IPI EN>>T>>'D CODE/NAMEl EG FIL 06 11 01 COPIES L>>TTR ENCL<
2 2
0 1
1
'EXTERNAL;: ACRS NSIC~
09 05 16 16 1
1 LPDR 03 1
1
~cr 8'2 ]gag TOTA'L NUMBER OF>> COP>>IES REQUIRED: TTR 38 ENCL'l 36
rtg
(
E 0
N C/
J'
P.O. 8OX 529100 MIAMI,FL 33152 FLORIDA POWER & LIGHTCOMPANY October 22, 1980 L-80-349 Office of Nuclear Reactor Regulation Attention:
Hr. Darrell G. Eisenhut, Director Division of Licensing U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Iilr. Eisenhut:
Re:
Turkey Point Unit, 3 Docket No. 50-250 Steam Generator Inspections The results of-the Turkey Point Unit 3 steam generator, inspections conducted during the current outage are attached.
The inspections which were p rformed in accordance with Turkey Point Unit 3 operating license DPR-31 showed no new phenomena and verified that the general pattern of denti ng in Unit 3 is within predictabl'e limits and consistent with previous inspections, of the Turkey Point Units.
The general criteria applied for steam generator inspections and preventive plugging. are the same as previously applied to Turkey Point Units 3 and 4 to provide in excess of six months of operation.
This approach provides reasonable "assurance of steam. generator tube integrity'such that safe operation of the unit. during normal, full power operation and during hypothetical accident conditions is assured for an operating period in excess of six effective full power months-.
Therefore, the implementation of. this program with the resulting preventive plugging, enables continued safe full power operation of Turkey" Point Unit 3 for a period in excess of six months-Total steam generator tube plugging at the conclusion of the current outage will be approximately 20.4%.
This is conservatively bounded by the 25> tube plugging ECCS analysis.
The results of this inspection and the preventive tube plugging program have been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 5 -Light Company Nuclear Review Board-They 'have concluded that based on the,'inspection
- results, the implemented plugging;,pattern, and previously submitted analyses, that the return: of Turkey. Point Unit 3 to full power operation for at least six effective months does not invol.ve an unreviewed safety. question.
In,accordance with'ondition E-5 of operating license DPR-31, Florida Power Light Company requests permission to return Unit 3 to power operation.
8 010800'f5'o/
5jho PEOPLE... SERVING PEOPLE
Darrell G.. Eisenh Office of Nuclear Reactor. Regulation Page 2
.0 Based on our current schedule, we could be 1eady to resume power operation by October 27, 1980.
We will, keep you advised of any significant changes-We have determined that this is a Class III request in accordance with 10 CFR 170.
Accordingly, a check for $4,000 is enclosed.
Very truly yours, Robert E. Uhrig~
Vice President Advanced Systems 8 Technology REU/RJA/pah Attachment cc:
J.
P. O'Reilly, Region II Harold F. Reis, Esquire
STATE OF FLORXDA
)
)
COUNTY OF DADE
)
ss being first, duly sworn, deposes and says:
Tha he is Vice Presid nt Light Company, the Licensee herein; of Florida Power a
Tha
- he has executed the foregoing document; that the state-ments. made in this said document are true and correct to the best of his knowledge, information, and belief, and Rat he is authorized to execute the document on behalf of said Licensee.
ichael C.
Cook Subscribed'nd sworn to before me this 9'9-day of NOTARY PUBLl
, in and for the County of Dade, State of Florida.
Notary Po'tio, State of t.:orida at Large Vy Ccrnrnh"'cn Exp!res October 30, 1SS3 My commission expires.: