L-81-370, Forwards Annual Ground Water Monitoring Program,Summary Rept,Jul 1980-June 1981. Rept Suppls Facility Annual Nonradiological Environ Monitoring Rept Submitted on 810331
| ML17341A498 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/26/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17341A499 | List: |
| References | |
| L-81-370, NUDOCS 8109040102 | |
| Download: ML17341A498 (2) | |
Text
(
~I ~
~
I I ~ a ra ee l
~
~
a ~
e ea
< i',a I
~ '.
~it t a
~, ~ a',
e.a'r.
J.
P. O'Reilly, Director, Region II Office of Inspection and Enforceioent U. S. Nuclear Regulatory Commission 101 marietta Street, Suite 3100 Atlanta, Georgia 303G3
Dear Hr. O'Rei lly:
Re:
Turkey Point Units 3
8 4
Docket Nos.
50-250 8 50-251 Groundwater I1oni toxin Rior t August 26, 1981 L-,'81-370 ggo L
sf!Bh "
gyp O31981>>
In accordance with Appendix 8, Section
- 4. 1. 1.2 of the Turkey Point Technical Specifications, Florida Power 8 Light Company submits herewith two
( 2) copies of the summary report, Groundwater 11oni toring Program, for the period July, 1980 through June, 1981.
The ienclosed report supplements the Turkey Point Plant Annual Non-Radiological Environmental 11onitoring Report, which was su~mitted on 1'1arch 31, 1981 (L-81-140).
Very truly yours,
).(i'g,..'
)
~
C;
.-~~4 ~-Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/RAK/ah Enclosures cc:
D tor, Office of Inspection and Enforcement 1).
irector, Office of Nuclear Reactor Regulation 171 l7 Robert Lowenstein, Esquire (w/o enclosure)
~gag'a ag7 Si09040i02 Si082b PDR ADOCK 05000250 R