ML17341B348
| ML17341B348 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/12/1982 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17341B347 | List: |
| References | |
| NUDOCS 8208200299 | |
| Download: ML17341B348 (5) | |
Text
1.
Chairman:
Vice president, Advanced Systems and Technology 2.
Member:
3.
Hanber:
4..
member:
5.
Member:
6.
Member:
7.
Member:
8.
Member:
6.5.2.3 ALTERNATES Chief Engineer, Power Plant Engineering Vice president, Nuclear Energy t<anager, Nuclear Energy Director of Nuclear Affairs
- tlanager, Nuclear Fuel Power Plant Engineering Principal Engineer Power Plant Fngineering Senior Project Hanager Alternate members shall'e appointed in writing by the CHRB Chairman to serve on a temporary basis;
- however, no more than two alternates
~shall participate in.CHRB activities at any one time.
6.5.2.4 CONSULTANTS Consultants sha't 1
be utilized as'determined by the CHRB to provide expert advice to the CNRB.
6.5.2.5 MEETING FRE UENCY The CNRB shall meet at least once per calendar quarter during the initial year of facility operation following fuel loading and. at least once per six 'months thereafter.
- 6. 5. 2.6
~UORUI<
A quorum of the CHRB shall consist of the Chairman or designated acting Chairman and four (4) members including alternates.
Ho more 8208200299 820812 PDR ADOCK 05000250 P
EXECUTIVE VXCE PRESIDENT VXCE PRESIDENT NUCLEAR ENERGY DEPARTMENT VXCE PRESIDENT ADVANCED SYSTEl)S 5
TECHNOLOGY VICE PRESXDENT ENGXNEERXNG PROJECT HGT 6 CONSTRUCTION MANAGER NUCLEAR ENERGY DEPARTMEHT CNRB ASSISTANT HAHAGER NUCLEAR ENERGY PART SXTE MANAGER PTP DIRECTOR NUCLEAR AFFAXRS PLANT MANAGER PSL PLANT MANAGER NUCLEAR-PTP MANAGER QUALITY ASSURANCE PLANT MANAGER FOSSXL PTP MANAGER NUCLEAR LICENSING MANA,GER NUCLEAR ENERGY SERVXCES UCLEAR ENERGY ERVXCFS STAF SUPERXNTENDENT QA-PSL PROJECT FXGURE 6.2-l OFFSXTE ORGANIZATION FOR FACXLXTY MANAGEHEHT AND TECHNICAL SUPPORT
1'
i i
~
~ ~ 4 i ~
~
~
4
~
~
NUCLEAR ENERGY SERVICES STAFF ti='h'Tti r'.i)YSICS VEPVR <<O )'IG. S. 2 I 1
1
.j NUCLEAR ENERGY SERVICES STAFF PIRE PRuTECTIOH ADHIIIISTRATOR RCPER TO PIGc 6.2 I OP Rh ONS SUPERINTENDENT NUCLEAR'l POSSI PLhihT l}DALI Y COtiTROD sUPERVIsOR SITc. ~i~hNAGER Pf A<T HL')AGER HUCLEAR TECHNICAL DEPART'K'IT SUPERVISOR PLAUDIT o".c.UR' SUPERVISOR HUG'AR SAFETY CORRI.TEE iud 'I~~NANC c'PE(rNTENDENT tKCLEAR i~
h Ai-HEALTH PHYSICS SUPEilVISOil Cllci)ISTRY SU?ERVISOR OPERATIONS SUPERVISOR REACTOR SUPERVISOR TRAIHI,'tG SUPERVISOR SHIPT TECHNICAL ADVISOR INSTRUVE.IT COHTROI SUPERVISOR ASSISTANT SUPERI)ITZiXDENT HECHANICAL tthl)ITENA)ICE hVCLEAR ASSIschiNT SUPEiRIHTEHDEAT ELECTRICAL HAIHTENANCE tiUCLEAII RAOIATIO:I I'ROTL'CTIOil
)~VI NUCLEhR PLAN'I'UPERVISOR 4
NUCLEAR 1)ATCII EtlGI NEER 4
1.
SENIOR OPERATOR LICENSE 2.
OPERATOR LICENSE LICENSED PERSONNEL ON SHIFT AS SHOWN IN TABLE 6.2-1 t)UCLEAil CO:i iilOL OPERAiOiR PLANT ORGAN:I "ATION CHART
'FIGURE 6.2-2 VNI,ICEHSED OPEAATO>ls