Final Status Survey Final Report Volume 3, Chapter 5, Survey Area Release Record for Land Survey Area 10, Survey Unit 14, Appendix P-6
ML17363A384
Person / Time
Site: 07000036
Issue date: 11/29/2017
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
References
HEM-17-70
Download: ML17363A384 (4)


Text

Hematite Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Decommissioning Project Westinghouse Non-Proprietary Class 3 Revision: 4 Appendix P-6, Page 1 of 4 APPENDIX P-6 FSS FIELD LOG Suney Area:

LSA 10

==

Description:==

Burial Pits Open Land Area Suney Unit:

14

==

Description:==

East Central Survey Unit (S. Burial Pit Area)

FSS Field Loi::

Dateffime:

Obsenation or Comment:

Technician 03/31/15 At 1440, prior to beginning GWS in LSA 10-14 a task-specific safety briefing Jahmai was terformed by tlie FSS sigervisor. At -1530 before commencinf GWS Williams the SS crew confirmed I &

integrity and performed a ~ality wal -down. ~~

Instrument C background levels were measured at 1 IK-1 gcpm. Weather

.u conditions were sunny, d~, and hot (70s F). At 1554 commenced background data log~ng of LSA I 0-1. Exited I & C at 1 715 to perform instrument post-use chec s. GWS files generated:

LSA_l0_14_0331 I5_C_JW _BACKGROUND 04/01/15 At 0815, grior to GWS of LSA 10-14 a task-specific safe~ briefing was Jahmai performe by the FSS Supervisor. Inclement weather grec uded morning Williams activities. Subsequently entered and verified I&C at 1 00, and performed a ~~£ 6

uality walk-down. Weather conditions were fair, cloudJ, and mild (60sF).

eneral area background was - 12K gim. At 1410 FS commenced GWS of LSA I 0-14. Exten3ed GWS past end o shift to take advantage of fair weather in light of forecast for inclement weather during subsequent work dw;s.

Exited I & C at 1900 and performed instrument post-use checks. G S files generated were:

LSA_10_14_0401 l 5_B_MC LSA 10 14 040115 C JW 04/02/15 At 0800, prior to conductin~ GWS ofLSA 10-14 a task-specific safe3'.

Jahmai briefin3 was performed by t e FSS Supervisor. Entered I & Cat 084,

Williams verifie I&C and performed a quality walk-down. Weather conditions were ~

~.

cloudy, windy, and cool (60sF). General area background is -12K gcpm.

~v Commenced GWS ofLSA 10-14 at 0900. At 1010 exited I&C due to onset of inclement weather. GWS Files Generated:

LSA_l 0_ 14_040215_8 _MC LSA_ l O_I4_040215_C _JW Qua! ity Record

Hematite Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Decommissioning Project Westinghouse Non-Proprietary Class 3 Revision: 4 Appendix P-6, Page 2 of 4 APPENDIX P-6 FSS FIELD LOG FSS Field Log _2_ of_4_

Date/Time:

Observation or Comment:

Technician 04/14/15 At 0930, a task-specific safez briefing was ferformed by the FSS Supervisor.

Matt Insl:ected l&C controls ofL A 10-03, 10-1, and 10-14 due to rain event.

Cushman 15 5 Entered into 10-13 to lierform a comparison test between 2" x 2" Na!

instruments "A" and "C".

ield tests indicate an approximate 4k :'[oss cpm 11(

difference between the two instruments. 1530 Resume GWS ofL A 10-14.

Weather is cloudy and -60 F. 1600 Soil sampling ofLSA 10-14 commences.

Exited l&C at 1715. GWS files generated:

LSA_IO_l4_041415_A_MC LSA 10 13 041415 A MC COMP LSA_ 10_13 _041415_C_JW _COMP 04/15/15 At 1000, prior to GWS ofLSA 10-14 a task-sEecific safety briefinj was Jahmai performed by the FSS Supervisor. Entered an verified I&C at 10 5, Williams performed a quality walk-down, and be~an GWS ofLSA 10-14. Weather

~~*-

conditions were farr, clout, and mild ( OsF). General area backfcound was -

12K gcpm. Secured the G S ofLSA 10-14 at1305 and exited I C. GWS files generated were:

LSA_l0_14_041515_A_JW 04/16/15 At 0905, prior to conductiniii°WS ofLSA 10-14, a task-specific safety Jahmai briefing was performed by e FSS Supervisor. Entered and verified I & C at Williams 0945, performed a quality walk-down, and commenced GWS ofLSA 10-14. ~~

Weather conditions were hot and sunuy (70sF). General area background was

-9K -1 OK gcpm. Coordinated with ogerations for dewaterin~ efforts at inaccessible areas. Exited T&C at 115. Re-entered T&C at I 20 to continue the GWS ofLSA 10-14. Concluded the GWS and exited l&C at 1715. GWS Files Generated:

LSA 10 14 041615 A JW LSA_I 0_14_041615_A2_JW LSA 10 14 041615 A MC 04/17/15 At 0900, prior to conductinffi GWS ofLSA 10-14, a task-specific safety Jahmai briefing was performed by t e FSS Supervisor. Coordinated with 0(5\\erations Williams for dewatering efforts ofmaccessible areas. Entered LSA 10-14 at 945,

--vr~

verified I&C, performed a quality walk-down, and commenced GWS.

Weather conditions were sunny and warm (70s F). Secured the GWS at I 042 due to a malfunctioning RS-232 connector, exited l&C at 1100, and voided the GWS file. Re-entered LSA 10-14 with a new RS-232 connector to continue the GWS at the bottom of excavation site. Operations assisted with dewaterin! and the positioning of a platform to allow for access to the base area near e man-made sump. Exited l&C at 1645. GWS Files generated:

LSA JO 14 041715 A JW(Voided)

LSA 10 14 041715 A MC Quality Record

Hematite Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Decommissioning Project Westinghouse Non-Proprietary Class 3 Revision: 4 Appendix P-6, Page 3 of 4 APPENDIX P-6 FSS FIELD LOG FSS Field Log _3_ of _1_

Dateffime:

Observation or Comment:

Technician 04/21/15 At 0755, FSS documents and 6irocedures were provided to the NRC Matt RW'slators and a dailt safety riefwas conducted in preparation to perform Cushman G Sin LSA 10-14. ntered LSA 10-14, verified I&C, performed a quality walk-down, and commenced GWS. Weather conditions were sunny and mild (70s °F). An abundance of water was noted at the base ofLSA 10-14. GWS fl(.

were performed on the upper regions of the LSA. Secured the GWS at 1205.

Re-entered LSA 10-14 to continue the GWS of the upper regions. Secured the GWS and exited I&C at 1635. GWS files generated:

LSA_10_14_042115 _A_MC LSA 10 14 042115 A2 MC 04/23/15 At 0830, grior to GWS ofLSA 10-14, a task-specific safety briefing was Jahmai erforme by the FSS Supervisor. After the conclusion of work in additional Williams SAs during the morning shift, FSS entered LSA 10-14, verified I&C,

...-~ -~..

performed a qualitY. walk-down, and began GWS at 1545. Weather conditions

1r_,

were sunny and mild (60s °F). General area background was - !OK gcpm.

Secured the GWS of LSA 10-14 at I 715 and exited I&C. GWS files generated were:

LSA 10 14 042315 A INVESTIGATION MC 04/24/15 At 0930, prior to conductin~ GWS of LSA 10-14, a task-specific safety Jahmai briefing was performed by e FSS Supervisor. Entered and verified I & C, Williams

¥.erformed a q_uality walk-down, and noted a deficiency in the Northeast silt,,---J~

ence. Supervision was notified. Weather conditions were mild and cloudy (60s °F). General area background was-9K-10K gcpm. Commenced the GWS ofLSA 10-14. Conducted multigie instrument and Wogress turnovers in the field at times 1130, 1300, and 150. Concluded the G Sand exited I&C at 1700. GWS Files Generated:

LSA _ 10 _ 14 _ 042415 _A_ JW LSA_10_14_042415_A2_JW LSA 10 14 042415 A MC LSA_10_14_042415_A2_MC 04/27/15 At 1215, priorto conductin~ GWS ofLSA 10-14, a task-sSecific safety Matt briefing was performed by e FSS Supervisor. Entered L A 10-14, verified Cushman l&C, performed a quality walk-down, and commenced GWS. Weather t{

conditions were sunny at 64°F. HDP commenced remediation of the elevated area and concluded at 1430. GWS file (A2) ienerated for completion of the HOP remediation efforts. Exited I&C at 150. GWS Files generated:

LSA_10_14_042715_A_MC LSA_l O_l4_042715 _A2_MC Quality Record

Hematite Decommissioning Project Dateffime:

04/28/15 04/29/15 05/14/15 Quality Record Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 Revision: 4 Appendix P-6, Page 4 of 4 APPENDIX P-6 FSS FIELD LOG FSS Field Log _4_ of_4_

Observation or Comment:

At 1000, prior to the biased sampling of LSA 10-14, a task-specific safety briefmg was performed by the FSS Supervisor. Entered LSA I 0-14, verified l&C, performed a quality walk-down, and began locating elevated areas for biased sampling. Weather conditions were sunny and mild at 66°F. 2 of the 3 locations previously identified were pinpointed and sampled. The third elevated area was unable to be located. Exited l&C at 1200. Re-entered LSA I 0-14 to perform GWS on sidewalls and fill in coverage gaps. General area background was - !OK gcpm. Secured the GWS ofLSA 10-14 at I 700 and exited I&C. GWS files generated:

LSA 10 14 042815 A JW Sample IDs:

Ll0-14-10-B-E-B-OO Ll0-14-12-B-E-B-OO At 0945, prior to GWS ofLSA 10-14, a task-specific safety briefing was performed by the FSS Supervisor. Entered LSA 10-14, verified l&C, performed a quality walk-down. Weather conditions were sunny and mild at 71 °F General area background was - ]OK gcpm. Began GWS of LSA 10-14 to locate an alternate position for biased sample L 10-14-1 I -B-E-B-00. An additional GWS was conducted to verify the absence of the initial elevated biased location that was deemed to be an erroneous reading. Exited l&C at 1115. GWS files generated:

LSA 10 14 042915 A JW LSA 10 14 042915 GAPFILL A JW Technician Matt Cushman Matt Cushman J( (_ __ _

At 0700, prior to conducting biased sidewall sampling of LSA 10-14, a task-Jahmai specific safety briefing was performed by the FSS Supervisor. Weather Williams conditions were cloudy and cool (70s °FJ. Sporadic rain showers precluded

,;," /. -z,/

any possibility for continuity of early field work. Entered LSA 10-14 to

~~

collect sidewall samples per NRC Directive. Verified I & C, and performed a quality walk-down. At 1435 sample collection was completed and the l&C boundary was exited. Sample IDs:

Ll0-14-13-B-E-B-OO L10-14-14-B-E-B-OO