ML18010A651

From kanterella
Revision as of 06:43, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 920609 in Atlanta,Ga Re Plant Self Assessment
ML18010A651
Person / Time
Site: Harris 
Issue date: 05/29/1992
From: Christensen H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9206230076
Download: ML18010A651 (3)


Text

Hay 29, 1992 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Carolina Power and Light Company Name of Facility:

Shearon Harris Docket No.:

50-400 Date and Time of Meeting:

June 9,

1992, at 10:00 a.m.

Location of Meeting:

Region II Office, Atlanta, Georgia Purpose of Meeting:

Shearon Harris Self-Assessment RII Cognizant Division:

Reactor Projects NRC Attendees:

.c S.

D. Ebneter, Regional Administrator, Region II (RII)

L. A. Reyes, Director, Division of Reactor Projects (DRP), RII A. F. Gibson, Director, Division of Reactor Safety, RII J.

P. Stohr, Director, Division of Radiation Safety and Safeguards, RII E. G. Adensam, Director, Project Directorate II-1, Nuclear Reactor Regulation (NRR)

D.

M. Verrelli, Chief, Reactor Projects Branch 1, DRP H.

O. Christensen, Chief, Reactor Projects Section 1A, DRP, RII R.

E. Carroll, Project Engineer, DRP J.

ED Tedrow, Senior Resident Inspector

- Shearon Harris N. Le, Project Manager, Project Directorate II-1, NRR Licensee Attende G.

E. Vaughn, Vice President, Harris Nuclear Project C.

S. Hinnant, General

Manager, Harris Nuclear Plant T. Morton, Manager, Maintenance C.

S. Olexik, Manager, Regulatory Compliance NOTE:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 2:00 p.m., June 8, 1992, via telephone call to H.

O. Christensen at (404) 331-5533.

Approved Distribution:

(See Page 2)

Original signed by:

. H. 0. Christensen H.

O. Christensen Reactor Projects Section 1A Division of Reactor Projects 9206230076 920529 PDR ADOCK 05000400 P

PDR

Notice of Significant Meeting 2

Nay 29, 1992 Distribution:

J. Taylor, Executive Director for Operations J.

Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director for Nuclear Materials
Safety, Safeguards and Operations Support T.
Murley, Director, Office of Nuclear Reactor Regulation J. Partlow, Associate Director for Project, NRR G. Lainas, Assistant Director for Region II
Reactors, NRR E. Adensam, Project Director, NRR J. Wechselberger, Regional Coordinator, EDO N. Le, Project Manager, NRR bcc:

S.

D. Ebneter J.

L. Milhoan A. F. Gibson L. A. Reyes J.

P. Stohr K. M. Clark All NRC Attendees on Notice Docket File

  • SEE PREVIOUS CONCURRENCE RII:DRP RII:DRP RII:DRP RlI:DRP
  • RCarroll:tj
  • HChristensen
  • DVerrelli 05/

/92 05/

/92 05/

/92

  • JJohnson 05/

/92

Notice of Significant Meeting 2

Nay 29, 1992 Distribution:

J. Taylor, Executive Director for Operations J.

Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director for Nuclear Materials
Safety, Safeguards and Operations Support T.
Murley, Director, Office of Nuclear Reactor Regulation J.

Par tlow, Associate Director, NRRfNbfBS->

G. Lainas, Assistant Director for Region II

Reactors, NRR E. Adensam, Project Director, NRR J. Wechselberger, Regional Coordinator, EDO N. Le, Project Manager, NRR bcc:

S.

D. Ebneter J.

L. Milhoan A. F. Gibson L. A. Reyes J.

P. Stohr K. M. Clark All NRC Attendees on Notice Docket Pile Qbg ~'Low RII:DRP

~

05/Pg /92 RII:D H

ristensen 09/Q/92 RII: RP DVerrelli 05/g(/92 RII.

JJ nson 05/~/92