ML18095A873
| ML18095A873 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 04/11/1991 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML18095A874 | List: |
| References | |
| NUDOCS 9104180038 | |
| Download: ML18095A873 (3) | |
See also: IR 05000272/1991005
Text
. *I
L..
,
Docket No.
50-272
50-311
50-354
License No.
APR 11 1991
Public Service Electric and Gas Company
A TIN:
Mr. S. E. Miltenburger
Vice President and Chief Nuclear Officer
P.O. Box 236
Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
SUBJECT: NRC INSPECTION REPORT NOS. 50-272/91-05; 50-311/91-05; 50-353/91-04
This letter transmits our findings of a routine inspection conducted by Mr. T. Johnson and
others of this office on February 13, 1991 through March 26, 1991. The inspection included
a review of activities authorized for the Salem and Hope Creek Generating Stations. At the
conclusion of the inspection, the findings were discussed with Messrs. S. LaBruna and J.
Hagan of you staff.
Areas examined during the inspection are identified in the report. While no violations are
identified for this period, several unresolved items were recognized as requiring further
review and evaluation by our staff, and will be addressed in subsequent inspections. We are
particularly interested in the circumstances in which a safety injection charging pump at
Salem was operated after maintenance, with the suction valve tagged closed. While not
affecting plant safety or operability at the time, the event appeared to be the result of multiple
personnel errors and procedural weaknesses in your operating and maintenance control
systems, to which management attention should be directed. Consequently, we will review
your evaluation of the adequacy of the planning and execution of the activities associated with
this event in the the next inspection period.
----
(
9104180039 --9!04:Cf---~
ADOCl<. 05000272
Q
J 'if ,: ,'"i 0 7
~-*
-..,,
.
...
Public Service Electric
and Gas Company
2
In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
No response to this letter is required. Your cooperation with us is appreciated.
Sincerely,
r*
. ib-rigin3! S**~;gn;;d by
i A. Randy Blough
A. Randolph Blough, Chief
Projects Branch No. 2
Division of Reactor Projects Notice of
Enclosure: NRC Inspection Report Nos. 50-272/91-05; 50-311/91-05; 50-354/91-04
cc w/encl:
S. LaBruna, Vice President - Nuclear Operations and Acting General Manager, Salem
Operations
J. Hagan, General Manager, Hope Creek Operations
J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
B. Preston, Manager, Licensing and Regulation
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
General Manager, Nuclear Safety Review
M. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
S. Ungerer, Manager, Joint Generation Projects Department,
Atlantic Electric Company
D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate
J. Lipot, State of New Jersey
K. Abraham, PAO
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
'
I
I
.J
.~ *
Public Service Electric
and Gas Company
3
bee w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Joyner, DRSS
R. Blough, DRP
J. White, DRP
J. Stone, NRR
S. Dembek, NRR
P. Kaufman, DRP
K. Brockman, EDO
L. Cheung, DRS
bee w/letter and Executive Summary Only:
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
J. Durr, DRS
L. Bettenhausen, DRS
M. Knapp, DRSS
W. Butler, NRR
~ \\(
42
DRP:RI
~~
~ T. P. Johnson
.,
3/28/91
c/~ DRP:RI.
1.r~
J. R. White
.... .,,.
,, .:ytl /91
"
DRP:RI
A. R. Blough
y //'>/91
OFFICIAL RECORD COPY