PNO-I-97-052, on 970817,NRC inspectors,on-shift at Time, Observed Approach to Criticality.Backshift Insp Coverage in Progress to Monitor Reactor Startup & Power Ascension Program.States of Nj & DE Notified
| ML18102B512 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/18/1997 |
| From: | Barber S, Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| References | |
| PNO-I-97-052, PNO-I-97-52, NUDOCS 9708190124 | |
| Download: ML18102B512 (1) | |
- August 18, 1997 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-I-97-052 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by Region I staff in King of Prussia, Pennsylvania on this date.
Facility Public Service Electric & Gas Co.
Salem 2 Licensee Emergency Classification Notification of Unusual Event Alert Hancocks Bridge,New Jersey Dockets: 50-311
Subject:
SALEM UNIT 2 REACTOR CRITICAL Site Area Emergency General Emergency X Not Applicable The Salem Unit 2 reactor went critical at 1:14 pm, August 17. NRC inspectors, on-shift at the time, observed the approach to criticality.
Backshift inspection coverage is in progress to monitor reactor startup and the power ascension program.
Prior to taking the reactor critical, the licensee resolved disagreement problems between the group rod position indication (GRPI) and the individual rod position indication (IRPI) for various control rods. These problems had been the primary source of the delay in achieving criticality.
Once the IRPis for all rods were recalibrated, the approach to criticality was resumed.
The States of New Jersey and Delaware have been notified.
The facts of this PN were confirmed by a representative from PSE and G Nuclear Licensing.
Contact:
S. Barber (610)337-5232 J. Linville (610)337-5129
,J
-I 9708190124 970818 PDR I~E PNO-I-97-052 PDR