MONTHYEARML17117A5542017-04-27027 April 2017 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: RAI ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) Project stage: Other ML17304A0102017-11-0101 November 2017 Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001) Project stage: RAI ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information Project stage: Other ML17304A9802017-11-13013 November 2017 & Waterford Steam Electric Stream Electric Station - Request for Supplemental Information (CACs MF9409, MF9424, MF9433 and MF9438; EPID L-2016-LRC-0001) Project stage: Other ML17307A3302017-11-20020 November 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools(Cac Nos. MF9920, MF9452, MF9437, MF9919, and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML17304B1532017-12-18018 December 2017 Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pool Project stage: Other ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML18030B2382018-04-13013 April 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other ML18144A2382018-05-24024 May 2018 Response to Generic Letter 2016-01, Request for Supplemental Information Project stage: Request L-75-522, Report of Leaking Socket Welds Will Not Be Available Until 11/21/19752018-05-24024 May 2018 Report of Leaking Socket Welds Will Not Be Available Until 11/21/1975 Project stage: Request AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML18145A0392018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. Project stage: Request ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information Project stage: Request RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-29029 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station Project stage: Request CNL-18-061, Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-31031 May 2018 Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Supplement L-16-016, Response to NRC Rais Regarding Generic Letter 2016-012018-05-31031 May 2018 Response to NRC Rais Regarding Generic Letter 2016-01 Project stage: Request ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information2018-05-31031 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information Project stage: Request ML18030B1782018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9441; EPID L-2016-LRC-0001) Project stage: Other ML18031A9952018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9423; EPID L-2016-LRC-0001) Project stage: Other ML18030B3612018-08-30030 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9427; EPID L-2016-LRC-0001) Project stage: Other ML18249A0752018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9410 and MF9411; EPID L-2016-LRC-0001) Project stage: Other ML18253A0992018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9414; EPID L-2016-LRC-0001) Project stage: Other ML18249A3652018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9437; EPID L-2016-LRC-0001) Project stage: Other ML18253A1302018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9920 and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML18249A3922018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9444, MF9445, MF9443, MF9440, MF9409; EPID L-2016-LRC-0001) Project stage: Other ML18249A3862018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9433 and MF9434; EPID L-2016-LRC-0001) Project stage: Other ML18249A2312018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9448; EPID L-2016-LRC-0001) Project stage: Other ML18249A0612018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9428 and MF9429; EPID L-2016-LRC-0001) Project stage: Other ML18249A0492018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9449 and MF9450; EPID L-2016-LRC-0001) Project stage: Other ML18249A0802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9431 and MF9430; EPID L-2016-LRC-0001) Project stage: Other ML18249A0912018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9421 and MF9422; EPID L-2016-LRC-0001) Project stage: Other ML18249A1622018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9424; EPID L-2016-LRC-0001) Project stage: Other ML18249A1782018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9438; EPID L-2016-LRC-0001) Project stage: Other ML18249A1802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9456 and MF9457; EPID L-2016-LRC-0001) Project stage: Other ML18249A2422018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9415 and MF9416; EPID L-2016-LRC-0001) Project stage: Other ML18249A3342018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9435 and MF9436; EPID L-2016-LRC-0001) Project stage: Other ML18249A3802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9412 and MF9413; EPID L-2016-LRC-0001) Project stage: Other ML18249A3832018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9418 and MF9419; EPID L-2016-LRC-0001) Project stage: Other ML18269A3512018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other ML18249A4072018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001) Project stage: Other 2018-04-13
[Table View] |
Text
Jaime H. McCoy Vice President Engineering Wr~~LF CREEK
~
'NUCLEAR OPERATING CORPORATION May 29, 2018 ET 18-0016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
Letter dated December 18, 2017, from D. A Broaddus, USNRC, to A C.
Heflin, WCNOC, Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools" - Request for Supplemental Information
Subject:
Docket No. 50-482: Response to Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools" Request for Supplemental Information To Whom It May Concern:
Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2016-01, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools," dated April 7, 2016, was issued to all power reactor licensees except those that have permanently ceased operation with all power reactor fuel removed from onsite spent fuel pool (SFP) storage. The NRC has issued GL 2016-01 for two purposes:
- 1) To request that addressees submit information, or provide references to previously docketed information, which demonstrates that credited neutron-absorbing materials in the SFP of power reactors and the fuel storage pool, reactor pool, or other wet locations designed for the purpose of fuel storage, as applicable, for non-power reactors, are in compliance with the licensing and design basis, and with applicable regulatory requirements; and that there are measures in place to maintain this compliance.
- 2) To collect the requested information and determine if additional regulatory action is required.
Reference 1 provided a request for supplemental information to Generic Letter 2016-01.
The attachment to this letter provides Wolf Creek Nuclear Operating Corporation's response to the request for supplemental information.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
ET 18-0016 Page 2 of 3 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine at (620) 364-4204.
JHM/rlt Attachment cc:
K. M. Kennedy (NRC), w/a B. K. Singal (NRC), w/a N. H. Taylor (NRC), w/a Senior Resident Inspector (NRC), w/a Sincerely, Jaime H. McCoy
ET 18-0016 Page 3 of 3 STATE OF KANSAS
)
) ss COUNTY OF COFFEY )
Jaime H. McCoy, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
SUBSCRIBED and sworn to before me this,2q#, day of mC-Gj
, 2018.
GAYLE SHEPHEARD My Appointment Expires July 24, 2019
~ I i ~
Expiration Date
~/r}. 4-/d O I °r
-~---17~----
Attachment to ET 18-0016 Page 1 of 2 WCNOC Response to Generic Letter 2016-01, "Monitoring Neutron-Absorbing Materials in Spent Fuel Pools" Request for Supplemental Information Below is Wolf Creek Nuclear Operating Corporation's (WCNOC) response to Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2016-01, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools," - Request for supplemental Information dated December 18, 2017. The NRC requests are provided in italics followed by WCNOC's response in that area.
NRC Wolf Creek Generating Station, Unit 1, RAls The licensee's November 2, 2016, letter states that Wolf Creek Generating Station, Unit 1 does not have a site-specific monitoring program. Instead, the licensee is relying on general industry operating experience as a surrogate for the condition of the Bora/ installed in the Wolf Creek Generating Station, Unit 1 spent fuel pool.
NRC-Wolf Creek Generating Station, Unit 1-RAl-1 Please describe how industry operating experience bounds the condition of the Bora/ at Wolf Creek Generating Station, Unit 1, thereby providing assurance that any degradation or deformation that may affect the Bora/ at Wolf Creek Generating Station, Unit 1 is identified.
Wolf Creek Generating Station, Unit 1 Response to Wolf Creek Generating Station, Unit 1-RAl-1 Through its Nuclear Safety Culture, procedures, and processes, Wolf Creek Nuclear Operating Corporation (WCNOC) systematically and effectively collects, evaluates, and implements relevant internal and external operating experience (OE) in a timely manner. Issues emerging from the use of Baral in the spent fuel racks are monitored through the WCNOC OE Program and Corrective Action Program.
As indicated in the original Generic Letter response for Wolf Creek Generating Station, Unit 1, the site will continue to monitor industry OE related to Baral, which includes ongoing participation in the Electric Power Research Institute (EPRI) Neutron Absorber Users Group (NAUG) and its related programs (e.g., industrywide learning aging management). Industry-wide, to date, there have been no indications of a loss of Baral material of a nature that diminished the neutron-absorbing capability of the Baral (Reference 1 ). Wolf Creek Generating Station, Unit 1, follows the EPRI Water Chemistry Control Program and there been no indications of a loss of Baral neutron-absorbing capabilities at a plant following the guidelines.
In addition, to date there are no plant-specific operating conditions or rack attributes that would merit concern that the Wolf Creek Generating Station, Unit 1 spent fuel racks or spent fuel pool (SFP) environment are not bounded by the industry-wide OE.
Finally, EPRI Report 3002013119 (Reference 2) documents that observed or foreseen degradation or deformation of the Baral has an insignificant impact on SFP criticality. The industry OE aligns with the Wolf Creek Generating Station, Unit 1 licensing basis.
The NAUG, through EPRI, is currently developing an industrywide program/database to aid in monitoring indications of potential Baral degradation and deformation.
Over 70,000 water chemistry data points have been collected to date, from over 30 SFPs, for this program.
Surveillance data from 50 coupons across 25 SFPs has also been collected to date.
The
Attachment to ET 18-0016 Page 2 of 2 program, supported by EPRI NAUG and industry participants, is described in EPRI document 3002013122 (Reference 3) and includes insights and feedback received from numerous communications with the NRG.
Relevant issues emerging from this industry effort will be monitored through the Wolf Creek Generating Station, Unit 1 OE Program and Corrective Action Program.
NRG-Wolf Creek Generating Station, Unit 1-RAl-2 Please discuss the criticality impact due to relevant material deformation identified in general industry operating experience, and how it can be accommodated by the nuclear criticality safety analysis of record for Wolf Creek Generating Station, Unit 1 without exceeding subcriticality requirements.
Wolf Creek Generating Station. Unit 1 Response to Wolf Creek Generating Station, Unit 1-RAl-2 To date, the industry OE has revealed no instances of an impact on SFP criticality due to observed Baral deformation (e.g., blistering) or degradation (e.g. pitting). The NAUG, through EPRI, has recently completed a study (Reference 2) which analyzes the criticality impact of blisters and pits on Baral. Simulations were performed for varying enrichment, burnup, areal density values, at unborated conditions (0 ppm), which is conservative for Pressurized Water Reactors such as WCGS. The study results demonstrate that pitting and blistering, on a scale much larger than any that has been observed in the industry OE, has an insignificant impact on SFP criticality. Therefore, the SFP criticality safety analysis of record remains applicable.
REFERENCES
- 1. EPRI Report 1021052, "Overview of Baral Performance Based Upon Surveillance Coupon Measurements," December 15, 2010.
- 2. EPRI Report 3002013119, "Evaluation of the Impact of Neutron Absorber Material Blistering and Pitting on Spent Fuel Pool Reactivity," May 21, 2018.
- 3. EPRI document 3002013122, "Roadmap for lndustrywide Learning Aging Management Program (i-LAMP)," May 11, 2018.