3F0618-01, Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1

From kanterella
Revision as of 18:20, 5 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1
ML18166A173
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 06/05/2018
From: Hobbs T
Duke Energy Florida
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
3F0618-01
Download: ML18166A173 (3)


Text

~';DUKE

~ ENERGY June 5, 2018 3F0618-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Docket 72-1035 Operating License No. DPR-72 10 CFR 50.54(p)

Subject:

Crystal River Unit 3 - Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1

Dear Sir:

In accordance with 1 O CFR 50.54(p), Duke Energy Florida, LLC (DEF) hereby submits the Crystal River Unit 3 (CR-3) Independent Spent Fuel Storage Installation (ISFSI) Physical Sec1,.Jrity Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1.

An evaluation of the plan revision, in accordance with 10 CFR 50.54(p)(2), has determined that the incorporated changes do not reduce the effectiveness of the plan and that the plan continues to meet the standards of 10 CFR 72.212(b)(9).

Thif> letter includes two enclosures that contain Safeguards Information as defined in 1 O CFR 73.2. Enclosure 1 contains a Summary Description of Changes. Enclosure 2 contains a copy of the CR-3 ISFSI Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1.

No new regulatory commitments have been made in this letter.

If you have any questions regarding this submittal, please contact Mr.

Licensing Lead, Nuclea; R;gurory Affairs, at (352) 501-3045.

Since~/w~

Terry Hobbs Mark Van Sicklen, General Manager Decommissioning - SAFSTOR TDH/mvs

Enclosures:

3661

/\\)/vf5S Z0

1. Summary Description of Changes [Safeguards]
2. CR-3 ISFSI Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1 [Safeguards]

xc:

NMSS Project Manager Regional Administrator, Region I NOTE: ENCLOSURE 1, AND 2 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION."

THIS INFORMATION MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THESE ENCLOSURES, THIS LETTER IS "DECONTROLLED."

A)/Jl.

jl)lv/5 >-

U.S. Nuclear Regulatory Commission 3F0618-01 DUKE ENERGY FLORIDA, LLC DOCKET NUMBERS 50 - 302 / 72 - 1035 LICENSE NUMBER DPR - 72 ENCL0SURE1

SUMMARY

DESCRIPTION OF CHANGES

U. S. Nuclear Regulatory Commission 3F0618-01 DUKE ENERGY FLORIDA, LLC DOCKET NUMBERS 50 - 302 / 72 - 1035 LICENSE NUMBER DPR - 72 ENCLOSURE 2 CR-3 ISFSI PHYSICAL SECURITY PLAN, SECURITY TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVIS_ION 1