/03L-0:on 791018,containment Integrity Violated When Caps Removed from Containment Penetration During Refueling Operations.Caused by Personnel Failure to Recognize Breach of Integrity.Plug Installed
ML19210D081
Person / Time
Site: North Anna 
Issue date: 11/16/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19210D073 List:
References
LER-79-144-03L, LER-79-144-3L, NUDOCS 7911200499
Download: ML19210D081 (2)


LER-1979-144, /03L-0:on 791018,containment Integrity Violated When Caps Removed from Containment Penetration During Refueling Operations.Caused by Personnel Failure to Recognize Breach of Integrity.Plug Installed
Event date:
Report date:
3381979144R03 - NRC Website

text

NGC FoRP.i 366 U. S. NUCLEAR REGULATORY COMMISSION (7-77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) a 6

lV lA lN lA lS l1 l@l 0 [ 0 ' - j 0 l 0 l 0 0 l 0 l-l0 l 0 l@l 4l 1l Il 1l 1 @l l

l@

o i

7 8 9 LICENSEE CODE 14 15 LICENSE NUMitLH 26 26 LICtfGL T YPE JJ 57 CA T L3 CON'T

"[" y l{@l 0 l 5 l 0 l 0 l 0 l 3 l 3 l 8 @l 1 l 0 l 1 l 8 l 7 l9 l@l 1] Il 1l 6l 7 ))@

O i

/

F 00 01 DOCKET P.UY3ER j

tr>

EVENT DATE 74 75 REPOHT DATE EO EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h lOn October 18, 19 79, containment integrity was violated when the caps were removed o

2 10 l 3 l jfrom a containment penetration during refueling operations.

Since all operations

[ Involving core alterations or movement of irradiated fuel in the containment buildina l

o 4

pere immediately suspended, the health and safety of the general public were not I

o s

o o

Pffected. This event is reportable pursuant to T.S. 6.9.1.9.d.

l0 l7l l l

0 8

l SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE lXlXl@ ] @ { @

Pl El Nl El TlR l@

X i@ W @

O 9 7

8 9

10 11 12 13 18 19 20 SEQUE N TI AL OCCURRENCE nm.

REVISION LE R:HO EVENT YE AR REFOR T NO.

CODE

'r, NO.

@,rgRr 7 l9 l_l [1 l4 [ 4l l,.-l 0l3l lL

[-j W

'j 30 31 32

_ 21 22 23 24 26 27 28 t

AKEf A TO ONPL fT f

HOURS 22 SS I FO P 600.

S PLIE MAP FA TU ER b@b@

l Z l@

lZ lh 10 0 l0 jO' [

g g lNlg Al@

Sl4l2l0[@

33 34 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORHECTIVE ACTIONS lil0l Both the inside and outside penetration pipe caps were removed for a containment fire protection tie-in to the penetration.

Personnel involved failed to recognize I

,, y that containment integrity was being breached.

Refueling operations were halted j

,,3, g and a plug was installed in the auxiliary building side of the penetration.

i 4 l

l 80 7

8 9 ST s

% POV.ER OTHER STATUS IS O fY DISCOVERY DESCRIPTION l1lLl [NJg l 0[ 0 0 gl NA l

lAlgl Operator Observation l

ACTIVITY CO TENT net OF RFLE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Iiis1[_ySEDJ @ lZ l@l l

l NA l

NA T

8 9 10 11 44 45 80 PERSONNEL E XPOSURES N

BER TYPE

DESCRIPTION

[ 0,U l0lglZlgl N

l i 7 unSONNE L IN;unS l30/

I3/

oESCniPnON@

NU g.E n I

I Ul@l l

i s

/

8 9 11 12 80 LOSS OF OH DAYAGE TO FACILITY T E D E SCRID TION U @l 7911200 NA i o 7

8 9 10 80 PUaLICitY NRC USE ONLY r

ISE JEp DESC P TION A

7 8 9 10 68 69 80 5 Oa

Virginia Electric and Power Company North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket No. 50-333 Report No. I,ER 79-144/03L-0

Description of Event

On October 18, 1979, during refueling operations, containment integrity was violated when the inside and outside pipe capa were removed from'a containment penetration.

This event is contrary to T.S. 3.9.4 and reportable pursuant t o T. S. 6.9.1.9.d.

Probable Consequences of Occurrence The consequences of this event were tainimal because all operations liriolving core niterations or movement of irradiated fuel in the containment building were immediately suspended.

As a result, the health and safety of the general public were not affected.

There are no generic implications associated with this event.

Cause of Occurrence The design change which breached the containment penetration had been properly authorized.

Following this, core alterations began and con-struction personnel working this design change exited the containment.

A coordination problem developed between the individual who authorized the work and refueling personnel.

Immediate Corrective Acton All refueling operations were suspended and a plug was installed in the auxiliary building side of the penetration.

Scheduled Corrective Action No scheduled corrective action is required.

Actions Taken to Prevent Recurrence The proper steps in the refueling procedure will be changed to prevent breaking containment integrity because of penetration work during core alterations.