TXX-3009, Notifies That Investigation Is Continuing of 1981-83 2300 MW Pipe Supports Which May Not Meet Seismic Requirements. Situation Is Considered Potentially Reportable
| ML19242D669 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/13/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3009, NUDOCS 7908160001 | |
| Download: ML19242D669 (1) | |
Text
_/LG TEXAS UTILITIES GENEIMTING COMinNY 2001 IlttYAN TOh Ett DALL\\S. TEX AS 73201 July 13, 1979 R. J. G AR Y
' 2 :.':.:.' ::'. ~.':'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446.
COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PIPE SUPPORTS FILE NO.
10110
Dear Mr. Seidle:
On May 18, 1979, we verbally informed your Mr. R. G. Taylor that pipe supports as presently designed may not meet seismic requirements.
We considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours,
)$N
??
J. Gary /
R RJG:dla cc:
NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 7ER 61\\
7 0 0816 O C3Cd