SPECIAL REPORT NO. 79-04 INTRODUCTION LACBWR Technical Specifications, Section 4.2.2.22, Action g, requires sampling and analysis for Iodine-131, -133, and -135, as well as gross beta and gamma activity between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a thermal power change of greater than 15% of rated thermal power within one hour.
This special report is required to contain the information determined by the analysis plus additional information regarding reactor power history, fuel burnup, cleanup flow history, off-gas activity levels and gross alpha activity levels.
SECTION 1 Off-gas activity level values reported in Special Report 79-03 for the reactor scrams occurring on September 28, 1979, and November 9, 1979, were obtained from the gas storage vault discharge monitor.
Previous Special Reports and Technical Specification limits are based on of f-gas activity levels obtained f rom the 150 cubic foot of f-gas holdup tank monitor.
For consistency's sake, the values obtained at the 150 cubic foot off-gas holdup tank monitor for the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the reductions in power reported on in Special Report 79-03 will now be provided:
(1)
September 28, 1979 0800-1600, 9/26/79---------------- ---------------303 Ci/ day 1600-2400, 9/26/79-----------------------------
--232 Ci/ day
- 0 0 0 0- 0 8 0 0, 9 /2 7/ 7 9 ------------------------------- 2 2 3 Ci /d ay 0800-1600, 9/27/79-------------+------------------224 Ci/ day 1600-2400, 9/2 7 / 7 9 ---------------------------- ---- 2 21 Ci/d ay 0000-0800, 9/28/79--------------------------------232 Ci/ day
- Change due to issuance of revised calculation constants after recalibration.
(2)
November 9, 1979 0000-0800, 9 / 7/ 7 9 - -- ---- --------- --- ---- -- ---- --- 2 3 0 C i /d ay 0800-1600, 9/ 7/79--------------------------------239 Ci/ day 1600-2400, 9 / 7 / 7 9 ------- ---------- -- ------ -- -- --- 2 3 4 C i /d ay 0000-0800, 9 / 8 / 7 9 ------------------------------ -- 2 3 6 Ci /d a y 0800-1600, 9/ 8/79--------------------------------194 Ci/ day 1600-2400, 9 / 8/ 7 9 -------------------- -- ------ ---- 19 0 C i /d a y i809.048 1-8001250 96R
~ '
SPECIAL REPORT NO. 79-04 SECTION 2 A reactor scram occurred at 0305 hours0.00353 days <br />0.0847 hours <br />5.042989e-4 weeks <br />1.160525e-4 months <br /> on November 29, 19 79, due to a spurious signal indicating that the Turbine Building Steam Isolation Valve was not fully open being received.
The reactor was operating at 85% of rated thermal power (41 MWe) at the time of the scram.
GROSS Sy ACTIVITY AND IODINE ANALYSIS Time of Sample:
0630, 11/29/79 Sample Results:
Gross S y ---------. 595 p Ci/ gram I 131--------------l.418 x 10-3 pCi/ gram I l33--------------1.824 x 10-2 pCi/ gram I l35--------------l.550 x 10 2 aci/ gram ADDITIONAL INFORMATION (1)
Reactor Thermal Power Level starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the thermal power change:
0300, 11/27/79 - 0305, 11/29/79 85%
(2)
The appropriate f uel burnup of assemblics in a symmetrical core region is depicted in Figure 1.
(3)
Cleanup Flow History starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the thermal power change:
Primary Purification Flow Rate 0300, 11/27/79 - 0305, 11/29/79 41 gpm Primary Purification Decontamination Factors (By) 0155, 11/29/79 1088:1 0049, 12/ 3/79 1020:1 (4)
Off-Gas Activity Levels for 48 Hours Prior to Thermal Power Change:
0000-0800, 11/27/79------------------------------244 Ci/ day 0800-1600, 11/27/79------------------------------270 Ci/ day 1600-2400, 11/27/79------------------------------263 Ci/ day 0000-0800, 11/2 8 / 7 9------------------------------ 2 4 4 Ci /d ay 0800-1600, 11/28/79------------------------------273 Ci/ day 1600-2400, 11/28/79------------------------------260 Ci/ day 1
18J)9 049 SPECIAL REPORT NO. 79-04 (5)
Gross Alpha Activity Level Starting With the Last Sample Taken Prior to Thermal Power Change:
- 0155, 11/29/79----------------------------2.70 x 10-8 pCi/gm
- 0305, 11/29/79----------------------------Reactor Scram 0043, 12/ 3/79----------------------------l.43 x 10-7 pCi/gm 1809 050 SPECIAL REPORT NO. 79-04 QUARTER CORE FUEL EXPOSURE ESTIM.'. TION (GWD/MTU)
AN INDICATION OF REGIONAL EXPOSURE AS OF NOVEMBER 29, 1979.
THE AVERAGE EXPOSURE:
6.866 GWD/MTU.
A B
C D
E F
G H
K L
1,.
I G~
2 1
li.
,Ik
'It li 3
W Y7RQ 4
Fe c
va
@r--'3 i
5
~
I N7 6f2
@~/
,9
@r 77 i
6 t
1 st 2.n s.is 2.i:
is.ti
~
L___.2f_ _@L 5.__.J
_ 4L i
10 7
2.n nt 2.si us IP I
II.
(7) v>
8
]
7.ls 3.26 3 09 L.9o
~fun i
in rz
@s an i
9 299 1.z!
' lea Iz
- _t c 10 His IN CORE FLUX MONITORS Q PLANT NORTH r..
a
.4
-:w...a pa,s.
FIGURE 1
{
~
J[f r,
s%.,
w
. r.A
-n-n gem es-
$p.
-ig,e:g;
- - ~.
m;;.
,~r*T:' ; x~
t, 2 c.,
m
'1809 051
'