ML19280A002

From kanterella
Revision as of 00:54, 3 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - FitzPatrick Emergency Amendment Public Conference Call Discussion Points - 3
ML19280A002
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/03/2019
From: Samson Lee
NRC/NRR/DORL/LPL1
To: Williams C
Exelon Generation Co
References
Download: ML19280A002 (2)


Text

1 NRR-DRMAPEm Resource From:

Lee, Samson Sent:

Thursday, October 3, 2019 3:58 PM To:

Williams, Christian D:(Exelon Nuclear)

Subject:

FitzPatrick Emergency amendment public conference call discussion points - 3 On-Load Tap Changer In the draft LAR dated October 2, 2019, Attachment 1, Section 2.0, the following is stated: Loss or degradation of normal AC power at the 4 KV level results in an automatic fast transfer or automatic residual transfer to the offsite AC power sources through the RSSTs 71T-2 and 71T-3. These transformers contain an On-Load Tap Changer to maintain the 4KV Bus voltages under various analyzed scenarios.

The licensee stated today in case the existing RSST 71T-3 cannot be repaired, the alternative will be to replace RSST 71T-3 with an old spare transformer. Does the old spare transformer has an On-Load Tap Changer? If not, will it impact the degraded voltage setpoints specified in JAFNPP TS Table 3.3.8.1-1.

Thanks, Sam

Hearing Identifier:

NRR_DRMA Email Number:

240 Mail Envelope Properties (BL0PR0901MB3185597138AF01AEA40CC7E99A9F0)

Subject:

FitzPatrick Emergency amendment public conference call discussion points - 3 Sent Date:

10/3/2019 3:57:50 PM Received Date:

10/3/2019 3:57:00 PM From:

Lee, Samson Created By:

Samson.Lee@nrc.gov Recipients:

"Williams, Christian D:(Exelon Nuclear)" <Christian.Williams@exeloncorp.com>

Tracking Status: None Post Office:

BL0PR0901MB3185.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 757 10/3/2019 3:57:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: