ML19282A955

From kanterella
Revision as of 23:20, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Insp Rept 70-1100/78-11 on 781128-30.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting,Including Organization,Operations,Measurements, Storage,Internal Control & Mgt of Matl Control Sys
ML19282A955
Person / Time
Site: 07001100
Issue date: 01/08/1979
From: Cohen I, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19282A953 List:
References
70-1100-78-11, NUDOCS 7903080420
Download: ML19282A955 (4)


Text

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 70-1100/78-11 Docket No.

70-1100 Safeguards Group 3

License No.

SNM-1067 Priority 1

Category UR Licensee:

Combustion Enaineerino. Incorocrated P. O. Box 500 Windsor, Connecticut 06095 Facility Name:

Nuclear Power Svstems - Manufacturing Inspection at:

Windsor, Connecticut Inspection conducted:

November 28-30, 1978 fx ['

Inspectors:

I-2'

'~

4 I. Cohen, Chemist date signed date signed cate signed Approved by: 7'N%

hw I-8-79 J. H. Joyner, Chief, huclear Material Control cate signed

'Tupport Sectiod, Safeguards Branch Inspection Summary:

Insoection on November 28-30,1978 (Recort No. 70-1100/78-11)

Areas Insoected:

Routine, unannounced inspection by a regional based inspector of nuclear material control and accounting including:

organization; operations; measurements; storage and internal control; and, management of the materials con-trol system.

The inspection involved 20 inspector-hours on site by one NRC regional based inspector.

Results:

No items of noncompliance were identified.

79030809 M Region I Form 12 (Rev. April 77)

DETAILS 1.

Persons Contacted

  • Mr. T. B. Bowie, Nuclear Materials Manager
  • Mr. G. Kersteen, Nuclear Materials Control Supervisor Mr. M. R. Thomas, Manager, Quality Control The inspector also interviewed other members of the production and engineering staffs.

denotes those present at the exit interview 2.

Organization The inspector reviewed the licensee's organization structure as it appears in the Fundamental Nuclear Material Control Plan (FNMC) and compared it with the licensee's current practice.

Positions described in the plan were filled by personnel having the necessary job qualifications.

Statements of responsibility have been issued in writing.

With regard to the FNMC plan, the licensee stated that there were some minor changes in titles of individuals and job responsibilities which will be submitted prior to January 15, 1979 as revisions to the plan.

No items of noncompliance were identified.

3.

Operations The inspector toured the facility to determine whether plant operations and internal control areas were as specified in the FNMC plan.

The in-spector also discussed with the licensee the practices and controls employed to assure that scrap materials are being removed from che facility within 12 months of generation.

No items of noncompliance were identified.

4.

Measurements and Statistical Controls The inspector met with the licensee's Quality Assurance person-nel and reviewed the licensee's procedure for nondestructive measurement of fuel pins.

The procedure is used to provide as-surance by the licensee that the fuel pins contain enriched

3 uranium having the required enrichment.

The inspector also observed nondestructive measurements being performed.

The weighing of UO2 powder receipts was discussed with operating personnel by the inspector who also inspected the scale used for weighing the receipts.

The inspector reviewed for ccmpliance with the requirement that receipt measurements be completed within 30 days of receipt of this material by reviewing the dates documented by the licensee for shipments ZWQ-ZEF 721, 722 and 723.

The receivers' data was dated within 30 days of receipt of these shipments.

The inspector reviewed the annual audit of the contractor per-forming uranium isotopic analyses for the licensee.

The audit was performed by the Quality Assurance group.

The audit was documented on a prepared checklist and there were r.o deficiencies noted by the auditors.

No items of noncompliance were identified.

5.

Storage and Internal Control The licensee has established an automated data collection and data processing system to provide current knowledge of the quantity, identity and location of special nuclear material within the fuel manufacturing operation.

The inspector reviewed the method of collecting and presenting data.

As a test of the system, the licensee was requested to obtain from the computer system a current listing of items within the storage area. The listing was pro-vided within one hour.

The printout showed the item identification, latest location and element and isotope content of the item.

Several items were selected at random and observed by the inspector to be located as shown on the printout.

The inspector reviewed the control of distribution and accounting for internal transfer documents and tamper-safing devices.

No items of noncompliance were identified.

4 6.

Management of Materials Control Systems The licensee's annual material control review was performed by members of the corporation's internal audit group.

A written report was issued by the auditors and distributed to licensee management.

There were no items of noncompliance noted by the auditors.

No items of noncompliance were identified by the inspactor.

7.

Exit Interview An exit interview was conducted on November 30, 1978, with the licensee representatives identified in paragraph 1.