Forwards IE Insp Repts 50-445/79-24 & 50-446/79-23 During Oct 1979.No Noncompliance Noted
ML19290B984
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/27/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19290B985 List:
References
NUDOCS 8001090011
Download: ML19290B984 (2)


See also: IR 05000445/1979024

Text

?5G

.

.

UNITED STATES

pmREcoq'o,

NUCLEAR REGULATORY COMMISSION

REGloN IV

O %)

$ I

S

611 RYAN PLAZA DRIVE SUITE 1000

D(#

( E

ARLINGTON, TEXAS 76012

%l% , , , , , +#l

C'Q .

November 27, 1979

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 79-24

50-446/Rpt. 79-23

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by our Resident Inspector, Mr. R. G.

Taylor, during the period of October 1979 of activities authorized by NRC

Construction Permits No. CPPR-126 and 127 for the Comanche Peak facility,

Units No. 1 and 2, and to the discussion of our findings with Mr. R. G. Tolson

and other members of your staff during the inspection period.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

We have also examined actions you have taken in regard to a previously identi-

fied finding.

The status of this item is identified in paragraph 2 of the

enclosed report.

Two new unresolved items are identified in paragraphs 2 and 7.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure.

The application must include a full statement of the

reasons why it is claimed that the information is proprietary.

The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

1730 352

8001090 (7)l l

-.

-

_.

,

.

Texas Utilities Generating Company

-2-

November 27, 1979

will also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

,'

,

/

,

'

W.C.Seid[g, Chief

Reactor CoMtruction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-445/79-24

40-446/79-23

cc: w/ enclosure

Texas Utilities Generating Company

ATTN:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

~