ML19294A960

From kanterella
Revision as of 08:32, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend of OL Re Tech Specs Requirement for Purging of Containment Through Standby Gas Sys.Certificate of Svc,Revised Tech Specs Pages 209 & 209a & Fee Encl
ML19294A960
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/19/1980
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19294A961 List:
References
NUDOCS 8002260491
Download: ML19294A960 (1)


Text

t 4

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 Niu M &HM,M.Imd rowAno o BAuEn. Ja.

ENo GENNAL c'ouNsEL (215) e41400o EUGENE J. BR ACLEY A ESOCI ATE GENERAL COUN SEL CON ALD BLANKEN R UDOt.PH A. CHILLEM t

"^

  • E"*E, cc,N Eu.

February 19, 1980 ASSi$ ANT GEN R AL COUNSEL EC'W ARD J. CULLEN JR.

JOHN F KENNEDY. JR.

Assist ANT COUNSEL Dr. Harold R. D2nton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Peach Bottom Atomic Power Station Units 2 and 3 Docket Nos. 50-277 and 50-278

Dear Dr. Denton:

Enclosed for filing with the Commission are three originals and 37 copies of Philadelphia Electric Company's Application for Amendment of Facility Operating Licenses DPR-44 and DPR-56.

This Application requests changes to tne Peach Bottom Technical Specifications relating to the require-ment for purging of the containment through the Standby Gas Treatment System.

In accordance with Section 170.12 of the Commission's regulations, I am enclosing a check payable to the United States Nuclear Regulatory Commission in the amount of $4,400 to cover the filing fee for this Application.

Very truly yours, e,

u ene r8 ey

, e s[6 EJB:mk 4

0 Enclosures g

D' l O

}k4 800226g g